| 1 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) (AR/GNIDA) |
| 2 | Trees (0.60mtr. Dia & 0.60mtr deep) |
| 3 | Shrubs (0.45mtr. Dia & 0.45mtr deep) |
| 4 | Supply & Planting of plants common varieties as required by engineer-in-charge in 8\\" X 12\\" sixe polythene bags or earthen pots well brandched and fully foliage branching dia 0.50 to 0.75mtr., free from disease at site i/c stacking with bamboos and binding with sutli (not below then 6'-8' common varieties) (As per market rate) |
| 5 | Supply & Planting of Shrubs, Plants height 2-2.5 feet as required by engineer in charge 16\\" X 8\\" Polythene bags or earthen pot fully foliage ad well branched free from disease (As per market rate) |
| 6 | Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km. lead completed. (Cattle manure measured in stacks will reduced by 8% for payment) (AR/GNIDA) |
| 7 | Supply of Neem oil cake Pulverized and un-decordicated packed in bags (As per market rate |
| 8 | Supply of stemed bone meal at site packed in bages. |
| 9 | Supply of Gypsum well packed at site in bags (As per market rate) |
| 10 | Supply of chlorpyriphos 20% E.C for anti termite treatment of plants @ 2ml. /plant and in the interval 1 month up to one year I.E.12 times in a year hence in comes 0.024 Itr. / plant (As per market rate) |
| 11 | Complete maintenance of trees on road side plantation (RSP) (out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge. |
| 12 | Trees (upto 4 & upto 3 year slow & fast growiing group) (Below 3year) (respectively)800.00X22 = 17600.00 Months |
| 13 | Complete maintenance of Shrubs on (RSP) (out side garden features) (jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge.14050.00X22= 309100.00 Months |
| 14 | Providing and watering for irrigation through water tanker of Horticulture features i.e. lawn. trees, shrubs, hedge/edge, ground cover etc. at the side of work water tanker having 5000Ltr. Capacity with one labour for watering /I/C cost of water, filling of tanker, watering at side with all leads and lifts as per direction of officer in charge. (AR/GNIDA) |
| 15 | Trees (upto 4 & upto 3 year slow & fast growiing group) (Below 3year) (respectively)800.00X22 = 17600.00 Months |
| 16 | Watering of 1 to 3 year plants (for Shrubs)14050.00X22= 309100.00 Months |
| 17 | Part-B |
| 18 | Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc, required for proper completion of the work (SOR-281) |
| 19 | Providing and laying of 80mm thick 1.5.1 mark factory made cement concrete interlocking concrete paver block made by block making machine with strong vibratory compaction of approved size.design,shape, laid in required colour and pattern over and including average 50mm thick compacted bed coarse sand and filling the joints with fine sand all complete as per the direction of Engineer-in-charge with conforming to IS-15658 |
| 20 | Steel work built-up section |
| 21 | Painting with synthetic enamel paint of approved brand and manufacture to given shade: two or more coats on new work |
| 22 | Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work (SOR-281) |
| 23 | Providing and fixing G.1 chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge DSR-16.70.01 |
| 24 | M-150 Brick Work in 1:4 cement & fine sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. |
| 25 | Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar. |
| 26 | M-150 Brick Work in 1:4 cement & fine sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. |
| 27 | Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar, |
| 28 | As in item 303 to 307 above but in superstructure including necessary Cutting & moulding of brick as required thickness of walls not to be less than 1% brick. Add extra labour to above items. |
| 29 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |