| 1 | Site clearance Clearing jungle manually including uprooting rank vegetation, grass, woody vegetation up to 30 cm girth measured at height of 1 m above ground level and removal of rubbish up to distance of 50 m outside the periphery of the area cleared |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. |
| 3 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (Rehandling of earth) (20% Less Rate) |
| 4 | Compaction Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding costof rolling. |
| 5 | Compaction Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction. |
| 6 | Compaction Extra for rolling to specifications. |
| 7 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- 0 to 1.5 m depth |
| 8 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- depth exceeding 1.5 ms but upto 3.0 ms. |
| 9 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- depth exceeding 3.0 ms but upto 4.5 ms. |
| 10 | Dressing of earth work New work or remodeling work.Unit |
| 11 | Laying Cement water slurry 1:3 with cement @ 2.25 kg per Sqm as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and Engineer-In-Charge. |
| 12 | Cement concrete lining 10cm. thick or less with mechanical Paver for irrigation channels, using cement concrete M-10 with cement content 225kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km Computerized Batching & Mixing plant mixed concrete lining on side slopes for vertical height above 3.50 m but upto 5.5 M |
| 13 | Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Square Rubble Coursed Rubble Masonry (first sort) |
| 14 | Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications. |
| 15 | Cement concrete lining 10cm. thick or less with mechanical Paver for irrigation channels, using cement concrete M-15 with cement content325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km Computerized Batching & Mixing plant mixed concrete lining on bed and on slide slopes upto vertical height 2.0m. |
| 16 | Cement concrete 1:2:4 |
| 17 | mixing by manual means |
| 18 | Plugging of Manhole with the help of sand filled bags including cost of sand and labour complete Job. |
| 19 | Pumping out water for execution of work. |
| 20 | Cranes 35 tonnes |
| 21 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Sandy material |
| 22 | Filling cement bags with sand, sewing and laying in position within 30 meters in water including cost of E.C bags and strings. |
| 23 | Providing and fixing angle iron pickets with angle iron size 40mm x 40mm x 6mm including cost of concrete block and painting complete in all respects. |
| 24 | Providing and streaching barbed wire 3 ply including cost of winding wire and aluminium painting complete in all respects. |
| 25 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete |
| 26 | Carriage of Surplus soil (Lead upto 15 Km) |
| 27 | Carriage of Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish, Earth. |
| 28 | 75 Km Please Enable Macros to View BoQ information |