| 1 | Cleaning of the site for warkable etc. All complete. (Non Scheduled) |
| 2 | Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) |
| 3 | Providing and laying cement concrete in 1:5:10 (1 cement :6 fine sand 12 stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter S.I. No. 01) |
| 4 | Class-150 brick work in 1:6 cement and Coarse sand 1.25 fineness modulus mortor in Foundation including supply of all material, labour and tolls and plants etc. All complete. (CP-6 S.I. No. 01) |
| 5 | Reinforced cement concrete work in walls/columns (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing exlcuding reinforcement, with 1:1.5:3 in heavier beam (1 cement: 1.5 coarse sand(zone-lll) : 3 graded stone). |
| 7 | Providing and laying cement concrete in 1:1.5:3 (1Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) and curing complete, lncluding cost of form work. ln Foundation and floors. |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 9 | Sub Total |
| 10 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 11 | Grand Total Please Enable Macros to View BoQ information |