| 1 | Safe Carriage of Following materials from Store Center to the actual site of work including measuring, weighing,Safe loading, unloading at both ends and proper stacking at site.(ALL DECENTRALISED MATERIAL (SUCH AS AL. LUGS, GROUTING MATERIAL, FENCING MATERIAL)WILL BE ARRANGED AND PROVIDED BY THE CONTRACTOR. |
| 2 | 100 KVA T/F, 11/0.43 KV 3 Phase |
| 3 | PCC pole 8.5 meter long |
| 4 | 11 KV MS T off Channel |
| 5 | Top channel (125*65*2240 mm) |
| 6 | S/S Base angle (75*75*6*2028 mm) with bol & Nut |
| 7 | 11 KV Disc insulator Composite |
| 8 | 11 composite pin Insulator |
| 9 | 11 Kv X Arm V Type |
| 10 | GI Wire 6 SWG |
| 11 | ACR Weasel conductor |
| 12 | LT XLPE cable |
| 13 | Stay set complete |
| 14 | Earthing set Complete |
| 15 | ABC Cable (3*120+1*95+1*16 SQMM) |
| 16 | 3 Phase Distribution box |
| 17 | Laying/Installation work inlcuding all the works as per RESPO/UPPCL Guidelines(All decentralized material will be provided by the contractor) |
| 18 | Providing and installation Holding Clamp for S/S with bolt and nut |
| 19 | Providing and installation 11 KV Fclamp with nut and bolt |
| 20 | Providing and installation X arm holding clamp with nut and bolt |
| 21 | Providing and installation wire for ABC Cable |
| 22 | Providing and installation Stone Pad 300*300*75 mm |
| 23 | Providing and installation Danger board with clamp |
| 24 | Providing and installation Barbed wire |
| 25 | Providing and installation Distribution clamp |
| 26 | Providing and installation Piercing connector |
| 27 | Providing and installation Eye hook |
| 28 | Providing and installation Suspension Clamp |
| 29 | Providing and installation dead end clamp |
| 30 | Concreting of poles as per uppcl guidelines |
| 31 | Providing and installation LUGS of suitable size |
| 32 | Providing and installation stay insulator |
| 33 | Providing and installation LT Tailless unit (Complete job) |
| 34 | Plinth for 100 Kva TF |
| 35 | Dobule pole structure with all necessary fitting and equipments required as per uppcl guidelines |
| 36 | Instllation of 100 KVA T/F, 11/0.43 KV 3 Phase with all required proper connection (Complete job) |
| 37 | Errection PCC pole 8.5 meter long |
| 38 | Installation of 11 KV MS T off Channel |
| 39 | Installation of Top channel (125*65*2240 mm) |
| 40 | Installation of S/S Base angle (75*75*6*2028 mm) with bol & Nut |
| 41 | Installation of 11 KV Disc insulator Composite |
| 42 | Installation of 11 composite pin Insulator |
| 43 | Installation of 11 Kv X Arm V Type |
| 44 | Installation of GI Wire 6 SWG |
| 45 | laying of ACR Weasel conductor |
| 46 | laying of LT XLPE cable |
| 47 | Installation of Stay set complete |
| 48 | Installation of Earthing set Complete |
| 49 | layingf of ABC Cable (3*120+1*95+1*16 SQMM) |
| 50 | Installation of 3 Phase Distribution box Please Enable Macros to View BoQ information |