|
| 1 | Supply & erection of 9 mtr long PSC poles confirming IS 1678/1998 approved with 300 KG wind pressure withstanding capacity. |
| 2 | Supply & erection of 11 mtr long 150x150mm RSJ poles confirming IS 1678/1998 approved |
| 3 | Supply & erection of 13 mtr long 150x150mm RSJ poles confirming IS 1678/1998 approved |
| 4 | 11KV 1 core 100 sqmm XLPE insulated AAAC (Unarmoured) |
| 5 | Supply & erection of 11KV 100 sqmm AAAC |
| 6 | Construction of Plinth Mounted,11/.4KV S/S using 11 Mtr Long RSJ Pole with double disc arrangement for 250 KVA Transformer.(Excluding pole & Transformer) |
| 7 | Construction of Plinth Mounted,11/.4KV S/S using 11 Mtr Long RSJ Pole with double disc arrangement for 500 KVA Transformer.(Excluding pole & Transformer) |
| 8 | Construction of 3-Ph AB Cable 3x95 + 1x70 + 1x16 sqmm on 9 mtr long PSC Pole for LT line (30mtr. Span) (Excluding Pole) |
| 9 | 11KV Line DP with AB Switch on 11mtr. RS Joist Pole (Excluding Pole) |
| 10 | 11 KV Single Pole Cut Point (Excluding Pole) |
| 11 | 11KV Single pole pin point Pole (Excluding Pole) |
| 12 | Accessories for erection of AB cable (w/o Pole & Cable) |
| 13 | Civil WorkPCC ratio 1:3:6 (M-10 grade) for DSS area (3.5x2.5x0.1) = 0.875 cum |
| 14 | Concreting ratio 1:1.5:3 (M-20 grade) for poles (0.5 x 0.5 x 1.5) = 0.375 cum per pole |
| 15 | Concreting ratio 1:1.5:3 (M-20 grade) for poles (0.5 x 0.5 x 0.45) = 0.1125 cum per pole |
| 16 | Stay Concreting ratio 1:1.5:3 (M-20 grade) for stay set (0.5 x 0.5 x 0.8) = 0.2 cum per stay |
| 17 | Construction of earthing chamber including excavation, soil treatment with bentonide powder 3mtr 40mm GI pipe with connection and all accessories etc. |
| 18 | Construction of ACB/LTDB plinth |
| 19 | Boundary Wall fencing with MS Gate for 250 KVA S/S |
| 20 | Boundary Wall fencing with MS Gate for 500 KVA S/S |
| 21 | Dismental Cost of DP & DSS S/S(250) |
| 22 | Dismental Cost of PSC/Joist poles |
| 23 | Inspection fees of Transformer including drawing approval etc. Please Enable Macros to View BoQ information |