| 1 | WOODEN FOOT BRIDGE 2 No's 15 FT SPANEarth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth,1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr fromcutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 3 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ftcomplete job as per directed by the site inchargeEngage 2 Carpenter for 24 days for making 2 foot bridge of Span 15 ft |
| 4 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ftcomplete job as per directed by the site inchargeEngage 4 Labour for 24 days for making 2 foot bridge of Span 15 ft |
| 5 | Providing and fixing of Nails |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work over an under coat of suitable shade with ordinary paint ofapproved brand and manufacture |
| 7 | Carriage of materials from source to site of work Stone av. Distance HL 500 Mtr |
| 8 | CONSTRUCTION OF PATH 10000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (notexceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposedearth to be levelled and neatly dressed in all kinds of soil. |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. |
| 10 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. |
| 11 | Surface dressing of the ground including removing vegetation and in-equalities notexceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -Allkinds of soil. |
| 12 | Carriage of materials from source to site of work by M.T.Stone av. Distance HL 500 mtr |
| 13 | CONSTRUCTION OF SHELTER SHED 24'x16' Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth,1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr fromcutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centringand shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stoneaggregate 40mm nominal size) (A) Crushed |
| 15 | Providing and laying in position cement concrete of specified grade including curing but excludingthe cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) |
| 16 | Providing and laying in position cement concrete of specified grade including curing but excludingthe cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size) |
| 17 | Providing and laying River Bed Material in layer not exceeding 20 cm in depth incuding spreadingrolling ,watering and compacting in with power road roller 8 to 10 ton power capacity road rollercomplete job |
| 18 | Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations:footings, bases of columns etc. for mass concrete |
| 19 | Structural steel work in single section fixed without connecting plate including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer all complete.Engage 3 Carpenter for 20 days for making Shelter Shed |
| 20 | Structural steel work in single section fixed without connecting plate including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer all completeEngage 9 Labour for 20 days for making Shelter Shed |
| 21 | Providing and fixing of Nails |
| 22 | Providing corrugated Colour Coated G. S. sheet roofing including vertical/curved surface fixed withpolymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers orwith G.I. limpet washers filled with white lead, including a coat of approved steel primer and twocoats of approved paint on overlapping of sheets complete (upto any pitch inhorizontal/vertical or curved surface)excluding the cost of purlins, raftersand trusses and including cutting to size and shape wherever required 0.63mm thick with zinccoating not less than 275 gram/m2 including all leads lift carriage complete job |
| 23 | Providing ridges or hips of width 60cm overall width plain G.S. sheetsfixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I.limpet and bitumen washers complete0.50 mm thick with zinc coating not less than 275 gram/m2 |
| 24 | Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate)finished with a floating coat of neat cement including cement slurry, but excluding thecost of nosing of steps etc. complete. 50 mmthick with 20mm nominal size stoneaggregate. (a) Crushed. |
| 25 | Carriage of materials from source to site of work by M.T. Sand av. 40 KM and HL 10 Km |
| 26 | Carriage of materials from source to site of work by M.T. Bajri av. 40 KM and HL 10 Km |
| 27 | Carriage of materials from source to site of work by M.T. Cement av. 40 KM and HL 10 Km Please Enable Macros to View BoQ information |