| 1 | Less Credit of Old Steel (-) |
| 2 | Credit of Old bricks available during dismantling. |
| 3 | Credit of old Brick Bats to be dismantled. |
| 4 | Supplying, erection, testing and commissioning of Horizontal centrifugal submersible pumping set for Raw water 1500 X LPM 45.00 m head as per specification of Engineer-In-Charge complete in all respects Make KSB, CRI, Kirtosker, Crompton Greeve, Lubi, Aqua) Discharge:- 1500 LPM X 45.00 M Head = 25.00 BHP |
| 5 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 0.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG)..- |
| 6 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER)1500 LPM x 45.00 M Head =25 BHP |
| 7 | Operation and Maintenance for complete scope of work i.e. Raw water arrangement and existing water works for WTP, mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/ Mtc. estimate complete in all respect as per Approved NIT.(i) During defect liability period (Operation only) after 3 monthTrial run period. |
| 8 | (iii) During 2nd year. |
| 9 | (iv) During 3rd year. |
| 10 | (v) During 4th year. |
| 11 | (vi) During 5th year. |
| 12 | Item Description HSR Item |
| 13 | H.S.R. Items DNIT Name :DNIT for Providing raw water arrangement, construction of raw water pumping station at Nigana feeder, laying of raw water rising main, upgradation of existing water works structures and laying of distribution system in village Dang Khurd Tehsil Tosham District Bhiwani” Construction of 1 No. RCC S/S Tank, Construction of CWT, Pump Chamber, Suction well for Raw water and Clear water, Water Treatment Plant 0.50 MLD, Pumping Machinery, Pipe line for Head works, C.C. Road and Path, Re-construction of Boundary wall, Construction of Sump well Pump Chamber, Boundary wall Pumping Machinery, Laying of rising main, Construction of RCC open inlet channel, Distribution system and operation and maintenance during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years in village Dang Khurd and all other works contingent thereto” Please Enable Macros to View BoQ information |