|
| 1 | Supply Item |
| 2 | pp & clamp ClampSP-55 75x10(As per Specification of RESPO & UPCL) |
| 3 | Bracing Clamp for SP-55 with N/B(As per Specification of RESPO & UPCL) |
| 4 | Nut & Bolts |
| 5 | EARTHING CLAMP(As per Specification of RESPO & UPCL) |
| 6 | STAY CLAMP FOR ST POLE WITH NUT BOLT(As per Specification of RESPO & UPCL) |
| 7 | STAY INSULATOR(As per Specification of RESPO & UPCL) |
| 8 | GI PIPE 6 METER LONG |
| 9 | 11 KV CABLE TIES FOR PIN INSULATOR(As per GTP & Specification of UPCL) |
| 10 | 11 KV IPC FOR COVERED TOCOVERED COND.(As per GTP & Specification of UPCL) |
| 11 | 11 KV IPC FOR COVERED TO BARECONDUCTOR(As per GTP & Specification of UPCL) |
| 12 | 11 KV MID SPAN JOINTING KIT(As per GTP & Specification of UPCL) |
| 13 | IPC WITH AL. BAIL FOR EARTHING 11KV(As per GTP & Specification of UPCL) |
| 14 | 11KV ACS AL-59 Sq.M 104.98 cover cond.(As per GTP & Specification of UPCL) |
| 15 | 11 KV TENSION CLAMP WITH BAIL &IPC(As per GTP & Specification of UPCL) |
| 16 | Line Work |
| 17 | ERECTION OF EARTHING ROD |
| 18 | FABRICATION OF STEEL |
| 19 | FIXING OF GI PIPE |
| 20 | EXCAVATION OF PIT FOR STAY SET |
| 21 | ERECTION OF 11 KV STAY SET |
| 22 | GROUTING OF STAY SET |
| 23 | EXCAVATION OF PIT FOR POLE |
| 24 | ERECTION OF SINGLE SP-55 POLE |
| 25 | ERECTION OF SP-55 DOUBLE POLE |
| 26 | GROUTING OF POLE |
| 27 | MUFFING OF POLE |
| 28 | LAYING OF U/G 11 KV CABLE INTRENCH |
| 29 | ERECTION OF BRACKET IN 11 KV LINE |
| 30 | LAYING OF DOG CONDUCTOR IN HTLINE |
| 31 | CONST.,INST.OF DANGER BOARD/NUMBER PLATE |
| 32 | MAKING OF SECTION POLE |
| 33 | FIXING OF 11 KV XLPE JOINTING KIT |
| 34 | CARTAGE SP-55 POLE, 0-20 KM |
| 35 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 36 | CARTAGE 11 KV PANELS, 0-20 KM |
| 37 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 38 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 39 | DISMANTLING OF FENCING AND GATE |
| 40 | MANUAL SHIFTING OF 11 KV VCB I/C |
| 41 | MANUAL SHIFTING OF 11 KV VCB O/G |
| 42 | RE-ERECTION OF FENCING/GATE |
| 43 | ERECT.11 KV VCB(O/G-B/C-I/C)PANEL |
| 44 | ROAD CUTTING AND REPAIRING |
| 45 | FIXING OF IPC WITH AL. BAIL FOREARTHING |
| 46 | FIXING OF 11KV 90KN TENSION CLAMPB&IPC |
| 47 | FIXING OF 11 KV SUSPENSION TIES |
| 48 | FIXING OF 11 KV MID SPAN JOINTINGKIT |
| 49 | ERECTION & LAYING OF 11KV CABLE3X300 |
| 50 | FIXING OF 11KV IPC FOR COVERED -COVERED |
| 51 | FIXING OF 11KV IPC COVERED TOBARE COND. |
| 52 | FABRIC.,MOUNT.,FIXING BRACING SETON D/P |
| 53 | LAYING, SAGGING OF COVERED CONDFOR 11KV |
| 54 | LOOPING AND CHOPPING OF TREEBRANCHES Please Enable Macros to View BoQ information |