|
| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | Supply of 8.5 Mtr. Long ST Pole 410 SP-10 (BPHD Galvanized) conforming to UPCL specification |
| 3 | Supply of 8.5 Mtr. Long ST Pole 410 SP-21 (BPHD Galvanized) conforming to UPCL specification |
| 4 | Supply of 8.5 Mtr. Long ST Pole 410 SP-23 (BPHD Galvanized) conforming to UPCL specification |
| 5 | Supply of M.S. Angle 50×50×6 mm |
| 6 | Supply of M.S. Channel 100×50 mm |
| 7 | Supply of 11 KV Polymer Disc Insulator (B&S Type) |
| 8 | Supply of 11 KV Polymer Pin Insulator complete with Pin |
| 9 | Supply of Disc Fitting (B&S Type) for Weasel/Rabbit Conductor, 45 KN |
| 10 | Supply of G.I. Earth Wire 7/1.6 mm (16 SWG) |
| 11 | Supply of M.S. Earthing Rod 20 mm × 2500 mm |
| 12 | Supply of G.I. Wire 5 mm (6 SWG) |
| 13 | Supply of G.I. Wire 4 mm (8 SWG) |
| 14 | Supply of Stay Set 16 mm × 1800 mm complete |
| 15 | Supply of G.I. Stay Wire 7/3.15 mm (7/10 SWG) |
| 16 | Supply of ACSR Weasel Conductor |
| 17 | Supply of ACSR Rabbit Conductor |
| 18 | Supply of LT XLPE Cable 1C × 25 Sq.mm |
| 19 | Supply of LT XLPE Cable 1C × 70 Sq.mm |
| 20 | Supply of LT XLPE Cable 4C × 25 Sq.mm |
| 21 | Supply of LT XLPE AB Cable 1C × 16 + 25 Sq.mm |
| 22 | Supply of LT XLPE AB Cable 3C × 16 + 25 Sq.mm |
| 23 | Supply of LT XLPE AB Cable 3C × 25 + 25 Sq.mm |
| 24 | Supply of 9 KV, 10 KA Polymeric Lightning Arrester |
| 25 | Supply of 9 KV, 5 KA Polymeric Lightning Arrester |
| 26 | Supply of Holding Clamp with J-Hook for AB Cable |
| 27 | Supply of E-Clamp for AB Cable |
| 28 | Supply of Top Channel Clamp for SP-55 Pole complete with Nut & Bolt |
| 29 | Supply of Top Channel Clamp for SP-23 Pole complete with Nut & Bolt |
| 30 | Supply of Stay Clamp for SP-21 Pole complete with Nut & Bolt |
| 31 | Supply of Stay Clamp for SP-23 Pole complete with Nut & Bolt |
| 32 | Supply of Stay Clamp for SP-10 Pole complete with Nut & Bolt |
| 33 | Supply of Earth Wire Clamp for SP-23 Pole complete with Nut & Bolt |
| 34 | Supply of Earth Wire Clamp for SP-10 Pole complete with Nut & Bolt |
| 35 | Supply of Earth Wire Clamp for SP-21 Pole complete with Nut & Bolt |
| 36 | Supply of Suspension Clamp complete with Eye Hook |
| 37 | Supply of Dead End Clamp for AB Cable |
| 38 | Supply of Stay Insulator 65 × 90 mm |
| 39 | Supply of Stay Insulator 75 × 90 mm |
| 40 | Supply of G.S. Earth Wire 7/16 SWG |
| 41 | Supply of LT Shackle Insulator 65 × 65 mm |
| 42 | Supply of LT Shackle Clamp for SP-10/SP-21 Pole complete with Nut & Bolt |
| 43 | Supply of HT Stay Insulator |
| 44 | Supply of Top Bracing Clamp for SP-23 Pole complete with Nut & Bolt |
| 45 | Supply of Bottom Bracing Clamp for SP-23 Pole complete with Nut & Bolt |
| 46 | Supply of 11 KV Drop Out Fuse Set complete |
| 47 | Supply of Assorted Size Nuts & Bolts |
| 48 | Supply of PG Clamp |
| 49 | Supply of Piercing Connector 35 Sq.mm × 25 Sq.mm |
| 50 | Supply of LT Distribution Box, 3 Phase |
| 51 | Supply of Aluminium Crimping Type Lugs 25 Sq.mm |
| 52 | Supply of Aluminium Crimping Type Lugs 70 Sq.mm |
| 53 | Supply of M.S. Half Clamp for LT Distribution Box |
| 54 | Annexure-B (Following work as per UPCL norms) |
| 55 | Providing and Installation of Chemical Earthing complete |
| 56 | Erection of Earthing Rod complete |
| 57 | Fabrication of Structural Steel complete |
| 58 | Excavation of Pit for Stay Set |
| 59 | Erection of LT Stay Set complete |
| 60 | Erection of 11 KV Stay Set complete |
| 61 | Cement Concrete Grouting of Stay Set |
| 62 | Excavation of Pole Pit |
| 63 | Erection of Single SP-10 Pole complete |
| 64 | Erection of Single SP-21 Pole complete |
| 65 | Erection of Single SP-23 Pole complete |
| 66 | Erection of Double Pole Structure using SP-23 Poles |
| 67 | Erection of Four Pole Structure using SP-23 Poles |
| 68 | Grouting of Pole |
| 69 | Muffing of Pole complete |
| 70 | Installation of 25 KVA Distribution Transformer on Pole Structure complete |
| 71 | Fixing of 11 KV Drop Out Fuse Set complete |
| 72 | Fixing of Lightning Arrester complete |
| 73 | Laying (Stringing, Sagging and Binding) of ACSR Rabbit Conductor for 11 KV Line |
| 74 | Guarding of LT/11 KV Line complete |
| 75 | Providing T-Off Connection from Existing 11 KV Line complete |
| 76 | Supply & Fixing of Danger Board and Number Plate complete |
| 77 | Cartage of SP-10 Pole for Lead 101–150 Km |
| 78 | Cartage of SP-10 Pole for Lead 51–70 Km |
| 79 | Cartage of SP-21/SP-23 Pole for Lead 51–70 Km |
| 80 | Cartage of SP-21/SP-23 Pole for Lead 101–150 Km |
| 81 | Cartage of Petty Materials for Lead 101–150 Km |
| 82 | Cartage of Petty Materials for Lead 51–70 Km |
| 83 | Cartage of Structural/Heavy Materials for Lead 101–150 Km |
| 84 | Cartage of 16/25 KVA DTR for Lead 101–150 Km |
| 85 | Cartage of 16/25 KVA DTR for Lead 51–70 Km |
| 86 | Head Load Cartage of SP-10 Pole for Lead up to 6 Km |
| 87 | Head Load Cartage of SP-23 Pole for Lead up to 6 Km |
| 88 | Head Load Cartage of SP-21/SP-23 Pole for Lead up to 1 Km |
| 89 | Head Load Cartage of SP-21/SP-23 Pole for Lead 1–3 Km |
| 90 | Head Load Cartage of Petty Materials for Lead up to 6 Km |
| 91 | Head Load Cartage of Materials for Lead up to 1 Km |
| 92 | Head Load Cartage of Materials for Lead 1–3 Km |
| 93 | Head Load Cartage of 25 KVA DTR for Lead up to 6 Km |
| 94 | Head Load Cartage of 25 KVA DTR for Lead up to 3 Km |
| 95 | Laying and Fixing of 1C × 25 Sq.mm/ 1C x16+25 Sq.mm. XLPE Cable complete |
| 96 | Laying and Fixing of LT XLPE AB Cable 3C × 25 + 25 Sq.mm complete |
| 97 | Laying and Fixing of LT AB Cable 3C × 35 + 1C × 25 Sq.mm complete |
| 98 | Laying and Fixing of LT AB Cable 1C × 35 + 1C × 25 Sq.mm/1C x 35+25 Sq.mm. complete |
| 99 | Installation of 3-Phase LT Distribution Box complete |
| 100 | Fixing of Suspension Clamp with I-Hook complete |
| 101 | Erection of Dead End Clamp complete |
| 102 | Supply & Fixing of Anti-Climbing Device complete |
| 103 | Erection of Stay Clamp complete |
| 104 | Fixing of Piercing Connector 50–25 Sq.mm complete |
| 105 | Fixing of PG Clamp 70–25 Sq.mm complete |
| 106 | Lopping and Chopping of Tree Branches complete |
| 107 | Construction of Special RCC Plinth for Two Pole Structure |
| 108 | Construction of Special RCC Plinth for Four Pole Structure |
| 109 | Painting of SP-21/SP-23 Pole complete Please Enable Macros to View BoQ information |