Tender For Immediate Measures, Including The Construction Of An Earthen R At The Marshy Site And Bunding To Prevent External Water Ingress From Adjoining Waterlogged Fields, To Enable Restoration Of The 1200 Mm Psc Pipeline., O/O Executive Engineer, Wd V, Ddw, Sanguem, Goa-Goa
Tender For Immediate Measures, Including The Construction Of An Earthen R At The Marshy Site And Bunding To Prevent External Water Ingress From Adjoining Waterlogged Fields, To Enable Restoration Of The 1200 Mm Psc Pipeline.
Name of Work:- Immediate measures, including the construction of an earthen r at the marshy site and bunding to prevent external water ingress from adjoining waterlogged fields, to enable restoration of the 1200 mm PSC pipeline.
Sl. No.
Item Description
1
Dewatering the trenches and bailing out water including removal of slush mud etc. for any depth and disposal of pumped mud water slush to suitable point not forming circuit of return of pumped water to the very trench by employing diesel generated pump
2
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
3
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacting to meet requirement of table 300-2)
4
Earthwork in excavation in saturated soil upto depth of 0.60 m including pumping or bailing out water and banking in layer for the purpose of making embankments or filling up ground depressions lead upto 20 m. and lift upto 1.5 m.
5
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
6
Centering & shuttering including Strutting Propping & removal of forms for :;Foundations Footings Bases for columns
7
Providing TMT steel reinforcement bars of (SAIL TATA. VIZAG JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
8
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.