| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : |
| 2 | A) Of area 3 sq. metres and below |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | A) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | B) 1:5:10 (1 cement : 5 coarse sand(zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 7 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). |
| 8 | A) Sal wood |
| 9 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. |
| 10 | A) Kiln seasoned and chemically treated hollock wood i) 30 mm thick |
| 11 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: |
| 12 | a) 30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws. |
| 13 | Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete : |
| 14 | 250x16 mm |
| 15 | Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : |
| 16 | 200x10 mm |
| 17 | 150x10 mm |
| 18 | Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete : |
| 19 | 125 mm |
| 20 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm(thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @3.3kg/sqm including pointing the joints with white cement and matching pigments etc., complete. |
| 21 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. |
| 22 | a)75 mm diameter |
| 23 | b)110 mm diameter |
| 24 | Providing and fixing on wall face unplasticised - PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. |
| 25 | i)Single tee with door |
| 26 | a)75x75x75 mm |
| 27 | b)110x110x110 mm |
| 28 | ii) Bend 87.5° |
| 29 | a)75 mm bend |
| 30 | b)110 mm bend |
| 31 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. |
| 32 | 20 mm cement plaster |
| 33 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 34 | Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. |
| 35 | Two coats. |
| 36 | White washing with lime to give an even shade : |
| 37 | Old work (two or more coats) . |
| 38 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 39 | One or more coats on old work. |
| 40 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 41 | Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). |
| 42 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground , all complete as per directions of Engineer-In-Charge. |
| 43 | With cement mortar 1:4 (1 cement : 4 fine sand). |
| 44 | Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: |
| 45 | Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm). |
| 46 | Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with: |
| 47 | Hollock wood. |
| 48 | Providing & fixing White vitreous china water closet squatting pan (Indian type) along with \\"S\\" or \\"P\\" trap including dismantling of old WC seat and \\"S\\" or \\"P\\" trap at site complete with all operations including all necessary materials, labour and disposal of dismantled material i/c malba, all complete as per the direction of Engineer-in charge. |
| 49 | Orissa pattern W.C Pan of size 580x440 mm |
| 50 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 51 | a)Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 52 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: |
| 53 | White Vitreous China Flat back wash basin size 550x 400 mm with single 15 mm C.P. brass pillar tap |
| 54 | Providing and fixing P.V.C. low level flushing cistern with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete. |
| 55 | 10 litre capacity - White |
| 56 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. A) Semi rigid pipe |
| 57 | 40 mm dia |
| 58 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : |
| 59 | Rectangular shape 453x357 mm |
| 60 | Providing and fixing 600x120x5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. |
| 61 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. : Internal work - Exposed on wall |
| 62 | 20 mm nominal outer dia. Pipes. |
| 63 | 25 mm nominal outer dia .Pipes. |
| 64 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : |
| 65 | 25 mm nominal bore |
| 66 | Providing and fixing uplasticised PVC connection pipe with brass unions : a) 45 cm length |
| 67 | 15 mm nominal bore |
| 68 | Providing and fixing PTMT bib cock of approved quality and colour. |
| 69 | 15mm nominal bore, 90 mm long. Weighing not less than 93 gms. |
| 70 | Cleaning of drainage line manhole, and interconnected sewer line by using bammboo/rod for clearing the sewerline, taking out sludge, building, rubbish and other waste materials from the sewer line and flushing with sufficient quantity of water to: |
| 71 | Cleaning of drainage line of diameter upto 200mm dia in the compound consisting of manholes, sewer lines, gully traps etc., including removing the sludge, silt, slash, waste etc., from the manholes and disposing the waste out side the compound etc., complete as per the direction of the Engineer-in-charge. |
| 72 | Cleaning of choked WCs (Indian/ European) and ensuring smooth flow etc., complete including labours and necessasry equipments as per direction of Engineer in Charge |
| 73 | Easening of wooden door and windows by removing and refixing after attending necessary repairs etc. including refixing old or missing screws if required as directed by Eng-in-Chagre complete |
| 74 | a) Doors |
| 75 | b) Windows |
| 76 | Dismantling wooden boardings/ planking in lining of walls, partitions and wooden floors, excluding supporting members but including stacking within 50 metres lead all complete complete as directed by EIC. : Thickness above 25 mm up to 40 mm |
| 77 | Thickness above 25 mm up to 40 mm |
| 78 | Repairs to wooden supporting structure of wooden flooring by replaceing cracked/ broken/ damaged/ sagged beams, making level of all framework by removing and refixing beams if required including MS screws, nails of all sizes, misc wooden packing material but excluding new wooden members which shall be paid for seperately, etc complete as directed by EIC. |
| 79 | Refixing existing wooden planks/ strips of flooring to supporting structure after cleaning and sawing if required with MS screws or nails including necessary alterations for levelled floor all complete as directed by EIC. |
| 80 | Removal of wild grown vegetation at walls/ roofs and floors/ drainage systems/ water supplying stream of the building/ over head tanks or at any location, pouring acid at the effected places and applying any special chemical to affected area to prevent future vegetation growth and finishing the same with cement concrete/ repair plaster to match the surface of walls/ floors/ roofs., etc complete as per the directions of Engineer-in-charge. (any cement concrete/repair plastering done shall be paid separately) (Uprooting of vegetation along with applying/spraying requisite chemical in each location will be measured as one job). |
| 81 | a) Up to floor two level |
| 82 | b) above floor two level |
| 83 | Cleaning of open drainage in the compound including removing the sludge, silt, slash, waste etc., from the drains and disposing the waste out side the compound etc., complete and to ensure proper disposal of rain water in the compound as per the direction of the Engineer-in-charge. |
| 84 | Repairs to steel windows by welding necessary hinges, GREESING/OILING for smooth function etc. including arranging welding machine at site and applying grease etc as directed. (each leaf shutter of window measured for payment) |
| 85 | Attending leakage from the nahani trap by dismantling the tiles,nahani trap,Cement concrte around it, replacing dismantled nahani trap with new 2 way nahani trap of approved quality 110mm x 75mm dia including providing and fixing 110mm dia PVC pipe in 110mm side of trap 15mm below finished floor level.(approx length 10 to15cm) , jointing of pipe and filling outer space of trap with cement concrete 1:2:4 (1Cement:2 coarse sand : 4 coarse aggregate and sand )and finishing top with white cement to match shade of tile etc. all complete as per the direction of Engineer in charge. |
| 86 | providing and fixing 35MM thick wooden plaking with tongued and grooved joints in flooring ,including removing damaged old flooring and fixing with iron screw complete as per direction of Engineer in Charge. |
| 87 | (a) First class local hard wood |
| 88 | Providing and fixing single line scaffolding system upto the required height made with bamboo's of 75 to 100 mm dia, 1.2 m centre to centre, horizontal & vertical- joining with ropes including providing working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Please Enable Macros to View BoQ information |
| 89 | Providing and fixing single line scaffolding system upto the required height made with bamboo's of 75 to 100 mm dia, 1.2 m centre to centre, horizontal & vertical- joining with ropes including providing working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Please Enable Macros to View BoQ information |