| 1 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make: Indian Cables Ltd./ Finolex / Havells / Polycab / RR Cables / CAPP / Gloster / Universal / Fort Gloster Industries Ltd./ Asian Cables Corporation Ltd 16 mm2 3core |
| 2 | RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 3550 LPM x 17.00 M Head having capacity 25.00 BHP |
| 3 | PANEL BOARDS FOR MOTOR: - Supply Erection, Testing and Commissioning of wall mounted electrical LT Panel board, fabricated from SWG CRCA sheet duly stoten with suitable angle iron frame work and completely powder coated of suitable size deep having following item for 1 Non clog submercible pumping)START DELTA STARTER :- 1. Main MCCB (ABB/LandT/SCHNEIDER - 01nos2. Controlling MCB - 01nos3.THERMAL OVER LOAD RELAY (ABB/LandT/SCHNEIDER) - 01 nos4. AUXILARY CONTACTOR (ABB/LandT/SCHNEIDER) - 03 nos5. START/STOP PUSH BUTTON (SCHNEIDER/SALZAR/SEIMENS)6. EMERGENCY SWITCH (SCHNEIDER/SALZAR/SEIMENS) - 01 nos7. DIGITAL VAF METER (SECURE/SELEC/TECHNO/ABB) - 01 nos8.CT RATIO - 100/5 (AE/KAPPA/LandT) - 01 nos9. CAPACITOR BANK AS PER LOAD REQUIREMENT10. CHANGE OVER SWITCH AS PER LOAD (SCHNEIDER/SALZAR/SEIMENS) - 01 nos11. SELECTOR SWITCH (SECURE/SELEC/TECHNO/ABB) - 01 nos12. SINGLE PHASE PREVENTER (SECURE/SELEC/TECHNO/ABB) -01 nos13. ELCB BREAKER (ABB/LandT/SCHNEIDER)3550 LPM x 17.00 mtr Head = 25 BHP |
| 4 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of1.50 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG)..- |
| 5 | Operation and Maintenance for complete scope of work i.e. Raw water arrangement and existing water works for WTP, mentioned in the DNIT (Disinfection material supplied by PHED) as per schedule-IV for a period of 5 year after 12 month during defect liability period and 03 Months trial run period will be charged to the A/ Mtc. estimate complete in all respect as per Approved NIT.i) During defect liability period (Operation only) after 3 monthTrial run period. |
| 6 | (ii)During 1st year after defect Liability period. |
| 7 | (iii) During 2nd year. |
| 8 | (iv) During 3rd year. |
| 9 | (v)During 4th year |
| 10 | (vi) During 5th year. |
| 11 | Item Description HSR Item |
| 12 | H.S.R. Items DNIT Name :MIRAN:- Estimate for up-gradation of water supply scheme and distribution system in village Miran District Bhiwani” Construction of 2 Nos RCC SandS tank, Construction of Pump Chamber with additional room, Construction of Suction well for RW and CW, CC path, pumping machinery, water treatment plat of capacity 1.50 MLD, Repair of 3 Nos existing CWT, Repair of B/wall, Dismantling of existing Structures at w/w, Laying of DI pipe line, Providing new FHTC, Providing and laying of RCC NP-2 Pipe Inlet Channel, Construction of Silt catch pit with retention tank, Pumping Machinery for raw water, Construction of Platform for DG Set, and Operation and Maintenance during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years complete in all respect and all other works contingent thereto” hurd and all other works contingent thereto” Please Enable Macros to View BoQ information |