| 1 | Excavation of pole pit (1.25m * 0.6m * 1.83 m) 9/9.14 mtr length by using JCB/Manual in Normal ground |
| 2 | Erection of pole 9 / 9.14 mtr. Length by using crane / Manual in Normal ground |
| 3 | Excavation of pole pit (1.25m * 0.6 m * 2.19m ) steel joist 36' and above length in Normal ground |
| 4 | Erection of pole steel joist 36' and above length in Normal ground |
| 5 | Transporting of 9 mtr pole from road side to pole pit upto 2 KM |
| 6 | Transporting of upto RSJ 36' pole from road side to pole pit upto 2 KM |
| 7 | Loading and unloading 9 mtr. PSC pole / Square pole |
| 8 | Loading and unloading Upto 36' RSJ pole |
| 9 | Loading and unloading of Distribution Transformer below 250 KVA |
| 10 | Loading and unloading of Line materials |
| 11 | Transporting of DT / line materials from substore to section office / workspot |
| 12 | Pole concreting |
| 13 | Coil earthing per pole & pole earthing |
| 14 | Erection of Distribution Transformer structure complete as per TNEB standard including painting , feeder arrangement , colour washing of RCC poles etc.., |
| 15 | Dismantling of Distribution Transformer structure complete as per TNEB standard including painting , feeder arrangement , colour washing of RCC poles etc.., |
| 16 | Erection of single pole structure including erection of DT complete structure complete with centre support |
| 17 | Excavation of stay pit (1 m * 0.5m*1.5m) in Normal Ground |
| 18 | Erection of stay set complete in Normal Ground |
| 19 | Fixing of V X arm 4 1/2 ' / 3 1/2 ' |
| 20 | Fixing of tapping channel X arm 3 1/2 ' |
| 21 | Fixing of LT three phase X arm |
| 22 | Fixing of LT single phase X arm |
| 23 | Fixing of HT / LT TI fittings |
| 24 | Fixing of LT pin insulator |
| 25 | Fixing of LT shackle insulator |
| 26 | Fixing of 11KV Disc |
| 27 | Fixing of Aluminium knob |
| 28 | Fixing of Guarding X arm |
| 29 | Fixing of HT pin insulator |
| 30 | Stringing , Sagging and binding of 11KV Lines for 7/3.15 and 7/3.35 HT line |
| 31 | Erection of transformer upto 250 KVA |
| 32 | Plinth work for upto 100 KVA DT with construction materials (Under ground 3' + above ground 7') (4.6x3.6\\") |
| 33 | Fixing of street light switching point arrangement |
| 34 | Dismantling of street light switching point arrangement |
| 35 | Drilling / Less than 23mm holes per hole / Slotted hole |
| 36 | Dismantling and reerection of single phase service connection. |
| 37 | Dismantling and reerection of three phase service connection. |
| 38 | Dismantling of deteriorated above 8 mtr. Poles with concrete damaged condition including grill separation etc., |
| 39 | Dismantling of deteriorated 8 mtr. Poles |
| 40 | Tree clearance in HT / LT Location for ordinary tree clearanace and throne bushes & trees |
| 41 | Dismantling of stay set complete in Normal Ground |
| 42 | Dismantling of transformer upto 250 KVA |
| 43 | Dismantling and refixing of V X arm 4 1/2 ' / 3 1/2 ' |
| 44 | Dismantling and refixing of LT three phase X arm |
| 45 | Dismantling and refixing of LT single phase X arm |
| 46 | Dismantling and refixing of HT / LT TI fittings |
| 47 | Dismantling and refixing of LT shackle insulator |
| 48 | Dismantling and refixing of Aluminium knob |
| 49 | Dismantling and refixing of Guarding X arm |
| 50 | Dismantling and restringing, resagging and rebinding of 11KV Lines for 7/4.09 ACSR conductor cut point |
| 51 | Dismantling and restringing, resagging and rebinding of LT line for 7/2.59 ACSR or 7/2.50 AAAC conductor |
| 52 | Dismantling and restringing, resagging and rebinding of LT line for 7/3.35 ACSR or 7/3.15 AAAC conductor HT Please Enable Macros to View BoQ information |