|
| 1 | PART- A Comprehensive Annual Maintenance Contract (CAMC) for trouble-free operation of UPS installed in IIT Roorkee Campus. |
| 2 | Comprehensive Annual Maintenance Contract (CAMC) for trouble free operation of VERTIV make 30 KVA, HIPULSE UPS Liebert model installed in Convocation Hall including replacement of all essential spares/ components. UPS Sr.No. :201806HU2125 |
| 3 | Comprehensive Annual Maintenance Contract (CAMC) for trouble free operation of VERTIV make 20 KVA, HIPULSE UPS Liebert model installed in Convocation Hall including replacement of all essential spares/ components. UPS Sr.No. :2101200782211501001A |
| 4 | Comprehensive Annual Maintenance Contract (CAMC) for trouble free operation of EMMERSON make, 06KVA UPS installed in Senate Hall(01 nos) including replacement of all essential spares/ components. UPS Sr.No. : 170206AS7854 |
| 5 | Comprehensive Annual Maintenance Contract (CAMC) for trouble free operation of , 05KVA UPS installed in Meeting Section, J.T. Building (PARADYNE 01 nos.)UPS Sr.No.:, 61161010 |
| 6 | PART- B [Supply, installation testing and commissioning of following items which will use as and when required. The rates should valid for CAMC period.Note: Quantity of items are purely variable which will be utilized as actual requirement basis. |
| 7 | Replacement of defective / weak DC capacitor of 6 KVA UPS system with new DC capacitor of suitable rating and OEM-approved make, including supply, installation, testing and commissioning, complete in all respects. The item includes dismantling and removal of the existing capacitor, refixing of new capacitor with proper mounting, electrical connections, functional testing of UPS, and commissioning to the satisfaction of the Engineer-in-Charge for 6 KVA UPS. |
| 8 | ………do……..but for 20 KVA UPS |
| 9 | ………do……..but for 30 KVA UPS |
| 10 | ………do……..but for 20 KVA UPS |
| 11 | ………do……..but for 30 KVA UPS |
| 12 | Replacement of defective / weak AC capacitor of 6 KVA UPS system with new AC capacitor of suitable rating and OEM-approved make, including supply, installation, testing and commissioning, complete in all respects. The item includes dismantling and removal of the existing capacitor, refixing of new capacitor with proper mounting, electrical connections, functional testing of UPS, and commissioning to the satisfaction of the Engineer-in-Charge. |
| 13 | …………do……..but for 20 KVA UPS |
| 14 | …………do……..but for 30 KVA UPS |
| 15 | Replacement of defective / non- functional AC axial cooling fan (4 inch) UPS system with new AC axial fan of suitable rating and OEM-approved make, including supply, installation, testing and commissioning, complete in all respects. The item includes dismantling and removal of the existing fan from installed posistin, fixing of new fan with proper mounting,electrical connections, air flow direction checking, functional testing of UPS, and commissioning to the satisfaction of the Engineer-in-Charge. |
| 16 | Part -C : Buy Back Items (Quantity of items are purely Indicative. However, It will be executed on actual basis.) |
| 17 | Buy Back of 6 KVA Isolation Transformers, as per actual |
| 18 | Buy Back of 20 KVA Isolation Transformers , as on actual |
| 19 | Buy Back of 30 KVA Isolation Transformers, as on actual Please Enable Macros to View BoQ information |