|
| 1 | WOOD AND PVC WORK |
| 2 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastner shall be paid for separately) |
| 3 | First quality irul wood |
| 4 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling wihich will be paid for separately, allcomplete s per direction of Engineer-in- charge. (Note: Butt hinges and necessary screws shall be paid separately) |
| 5 | First class teak wood |
| 6 | 35 mm thick shutters |
| 7 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts exlcuding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick |
| 8 | Float glass panes |
| 9 | 4 mm thick glass pane (weight not less than 10kg/sqm) |
| 10 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S flats, sqare or round bars etc. including priming coat with approved steel plrimer all complete |
| 11 | Fixed to openings/wooden frames with rawll plugs screws etc. |
| 12 | Providing 40x5 mm flat iron hold fast 400 mm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embedding in cementconcrete block 300x100x150 mm 1:3:6 mix (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size |
| 13 | Providing and fixing IS:12817 marked stainless steel butt hinges with stainless steel screws etc. complete |
| 14 | 100x58x1.90mm |
| 15 | FINISHING |
| 16 | 12 mm cement plaster of mix: |
| 17 | 1:4 (1 cement : 4 fine sand) |
| 18 | Lettering with black Japan paint of approved brand and manufacture |
| 19 | Wall plainting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour |
| 20 | One coat |
| 21 | Two coats |
| 22 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content |
| 23 | With water thinnable cement primer on wall surface having VOC content less than50 grams/litre |
| 24 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade |
| 26 | One or more coats on old work |
| 27 | French spirit polishing: |
| 28 | One or more coats on old work |
| 29 | Finishing walls with Acrylic smooth exterior paint of required shade: |
| 30 | Old work (Two or more coat applied @ 1.67 ltr/10 sqm ) on existing cement paint surface |
| 31 | Finishing floors with premium floor guard (Apex floor guard or equivalent) with Silicone additives of requied shade: |
| 32 | One or more coats applied as per manufacturer specifications |
| 33 | REPAIRS TO BUILDING |
| 34 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meteres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge |
| 35 | With cement mortar 1:4 (1 cement : 4 fine sand) |
| 36 | Renewing glass pane, with wooden fillets wherever necessary: |
| 37 | Float glass panes of nominal thickness 4 mm (weight not less than 10 kg/sqm) |
| 38 | Providing and fixing bright finished brass hard drawn hooks and eyes: |
| 39 | 100 mm |
| 40 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as requied, all complete as per the direction of the Engineer-in-charge |
| 41 | Dismantling and Demolishing |
| 42 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead: |
| 43 | Of area 3 sq. meters and below |
| 44 | Dismantling wood work in frames, trusses purlins and rafters up to 10 meters span and 5 meters height including stacking the material within 50 meters lead: |
| 45 | Of sectional area below 40 square centimeters Please Enable Macros to View BoQ information |