| 1 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. (a) All kind of soil |
| 2 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. |
| 3 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between thetwo posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Costof posts, struts, earth work and concrete work to be paid for separately).Payment to be made per metre cost of total length of barbed wire used.(a) With G.I. barbed wire |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.(a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 6 | Lettering with black Japan paint of approved brand and manufacture |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :(a) Two or more coats on new work |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 9 | TOTAL = 15,97,123.00 |
| 10 | Add GST factor @0.973= 15,54,001.00 |
| 11 | Add cost index @ 3% Please Enable Macros to View BoQ information |