|
| 1 | Earth work in excavation for foundation trenches in all sorts of soil including removing spreading of staking the spoils within a lead of 75m as directed including trimming the side of trenches leveling, dressing and ramming the button, bailing…………………...........etc |
| 2 | Earth Work in filling of foundation trenches of plinth with good earth in layers not exceeding 15cmm including watering ramming etc.layer by layer complete ( payment to be made on the basis of measurement of finished quantity work) (a)With earth obtained from excavation of foundation |
| 3 | Filling foundation by silver sand |
| 4 | Single brick flat soling of picked jhama brick including ramming and dressing bed to proper leveling and filling joints with local sand |
| 5 | Cement concrete with 30 mm down graded shigles excluding shuttering. |
| 6 | Ordinary Cement concrete(1:1.5:3) with 20m m. down well-graded river bazree excluding shuttering and reinforcement. |
| 7 | M.S. Tor steel reinforcement (for R.C.C. work) including distribution bars,stirrups,binders etc. including cost of bars initial straightening and removal of loose rust if necessary cutting to requisite length, hooking and bending to correct shape |
| 8 | Hire and labour charges for shuttering with entering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns,lintels curved or straighting |
| 9 | Above PL |
| 10 | Brick work with 1st class in cement morter (6:1)…………………………..etc. |
| 11 | 125mm thick brick work in cement mortar (4:1) in ground floor |
| 12 | Wood work for door window frame fine dressed fitted and fixed |
| 13 | Z battern shutter for door window as per design |
| 14 | Plaster (to wall, floor, ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surfece, including throating, nosing and drip course wherer necessary |
| 15 | Plaster with sand and cement morter 20mm thick plaster……….etc. |
| 16 | Plaster with sand and cement morter 10mm thick plaste(with 4:1) cement concrete…….etc. |
| 17 | Neat cement punning about 1.5mm thick in wall dado……..etc. |
| 18 | Supplying fitting fixing MS Clamps |
| 19 | Iron Butt hings |
| 20 | Iron haps bolts |
| 21 | Iron socket bolts |
| 22 | Primer one coat to timber or plastered surface or on steel |
| 23 | Painting with best quality |
| 24 | Rendering the surface of wall and ceiling |
| 25 | Acrylic Distemper to interior wall , ceiling with a coat of solvent |
| 26 | supplying fitting and fixing door frame with MS angle as per |
| 27 | Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, |
| 28 | 100 mm dia boring TW pipe |
| 29 | Supply of PVC pipe & fitting schedule 80 (medium duty) |
| 30 | 100 mm dia medium quality |
| 31 | Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. |
| 32 | Supply of long screw (150 mm long) TATA make |
| 33 | Supplying fitting fixing heavey tubewell mouth reducing |
| 34 | Supplying fitting and 300 mm MS housing clamps |
| 35 | Supplying fitting fixing Check valve (Vertical) |
| 36 | Supplying fitting fixing Check valve (Horizontal) |
| 37 | Supplying P.V.C. water storage tank of approved quality with closed top 1000 liter |
| 38 | Supplying P.V.C. water storage tank of approved quality with closed top 500 liter |
| 39 | Labour for hoisting plastic water storage tank. |
| 40 | Labour for punching hole in plastic water storage tank upto 50 mm dia |
| 41 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match. |
| 42 | For expose work 15 mm dia |
| 43 | Chromium plated Bib cock long body |
| 44 | Construction of circular soak well |
| 45 | MS Structure with hollow section |
| 46 | MS Structure IN Column, beam etc. |
| 47 | Supplying fixing commissioning and testing solar voltaic module 250 WP 40V on existing iron frame structure. |
| 48 | Supplying fitting fixing & installation of Iron removal filter |
| 49 | 1 set cable and accessories |
| 50 | Supplying fitting fixing MC4 connector for panel loop |
| 51 | Earthening with 50mm (2'') dia G.I. pipe 3.64 mm thick x3 mts. Long and 1x4 SWG G.I. wire |
| 52 | Power conditioning unit for 2HP sub mersible pump set |
| 53 | Supply, Installation testing & lowering of 1.5 hp oil solar |
| 54 | Labour Cess Please Enable Macros to View BoQ information |