|
| 1 | Supplying of developed seasonal flowers saplings of height minimum average hight 150 mm with poly bags of size minimum 150 mm high and 100 mm dia including cost of sapling, royalty and carriage with all required leads and lifts as per the direction of E.I.C. & Terms and Conditions/Specifications of the contract. sapling shall be of free from insects and pats with flower. Any causality within fifteen days of supply of saplings shall be replaced by the contractor at his own risk and cost. The type and nos. of plants to be decided at the nursery from the following list : | Supplying of developed seasonal flowers saplings of height minimum average hight 150 mm with poly bags of size minimum 150 mm high and 100 mm dia including cost of sapling, royalty and carriage with all required leads and lifts as per the direction of E.I.C. & Terms and Conditions/Specifications of the contract. sapling shall be of free from insects and pats with flower. Any causality within fifteen days of supply of saplings shall be replaced by the contractor at his own risk and cost. The type and nos. of plants to be decided at the nursery from the following list : |
| 2 | Providing & planting of following Plants- | Providing & planting of following Plants- |
| 3 | Indoor Plants (Ornamental Plants) | Indoor Plants (Ornamental Plants) |
| 4 | Supply & spreading of following Insecticides/ Fungicide , tarmicide | Supply & spreading of following Insecticides/ Fungicide , tarmicide |
| 5 | Supplying and spreading of fertilizer:- | Supplying and spreading of fertilizer:- |
| 6 | Tractor with herrowSupply of tractor with herrow, plough & trilling & cultivetor. | Tractor with herrowSupply of tractor with herrow, plough & trilling & cultivetor. |
| 7 | Tractor With trollySupply of tractor With trolly & Water tankar ( 5000 Ltr. capacity) | Tractor With trollySupply of tractor With trolly & Water tankar ( 5000 Ltr. capacity) |
| 8 | JCBSupply of JCB for excavation ,levelling, rough dressing etc. | JCBSupply of JCB for excavation ,levelling, rough dressing etc. |
| 9 | Clearing of wild grassClearing of wild grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | Clearing of wild grassClearing of wild grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 10 | Earth work in excavationEarth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq. m on plan), including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, as and when required. All kinds of soil. | Earth work in excavationEarth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq. m on plan), including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, as and when required. All kinds of soil. |
| 11 | Good earthSupplying, stacking, filling/ spreading of good earth free from stone, rubbish etc. including royalty and carriage with all leads (earth measured in stacks will be reduced by 20% for payment). | Good earthSupplying, stacking, filling/ spreading of good earth free from stone, rubbish etc. including royalty and carriage with all leads (earth measured in stacks will be reduced by 20% for payment). |
| 12 | Dump manureSupplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 16 mm. | Dump manureSupplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 16 mm. |
| 13 | Local fine river sandSupplying and stacking at site local fine river sand including carriage with all leads. | Local fine river sandSupplying and stacking at site local fine river sand including carriage with all leads. |
| 14 | Selection No. 1 grassGrassing with selection No. 1 grass including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and earth shall be paid for separately). In rows 5 cm apart in both directions. | Selection No. 1 grassGrassing with selection No. 1 grass including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and earth shall be paid for separately). In rows 5 cm apart in both directions. |