|
| 1 | Providing, fabricating, and installing tensile roofing system with 700 GSM PVC-coated polyester fabric (PVDF topcoat) for permanent outdoor installation, including structural support system, stainless steel fittings, anchoring, and pre-tensioning, complete in all respects as per design and engineer-in-charge. |
| 2 | Dismantling tile work in floors, wall and roofs laid in cement mortar including stacking material within 50 metres lead.(Fountain Work) For thickness of tiles 10 mm to 25 mm |
| 3 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shadecomplete. |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade ,Two or more coats on existing work |
| 5 | Railing sill repairing in plaster 1:6 |
| 6 | FOUNTAIN – 1Designing, supplying, Installation & Testing of sequencing fountain. Programmed to come up in various combinations and variations. Nozzles are made of brass chrome plated, Fittings and mounting stands are made from steel-galvanized/epoxy coated. High quality rubber gaskets, nuts & bolts and foundation bolts along with control valves to adjust flow pressure.Designing, supplying, Installation & Testing of Pump set & electric panel comprise of totaling 03 HP monosumbersible pump set (Kirloskar/Crompton). Panel comprises VFD system to give dynamic effect to water, motor main switch, contactors, overload relays, switch fuses, light sequencer, push button on off switches, indicating lamps etc. complete with internal wiring. Lighting system shall be connected by a seperate switch. |
| 7 | FOUNTAIN - 2Repairing & Installation & Testing of 4 mtr dia ring fountain with not less than 40 nos. ball joint. Nozzles are made of Brass-nickel/Chrome plated. High quality All Nuts & bolts and foundation bolts along with control valves to adjust flow pressure. With existing stone statue in center.Designing, supplying, Installation & Testing of Pump set & electric panel comprise of not less than 5 HP monosumbersible pump set (Kirloskar/Crompton/Equivalent). Panel comprises of motor main switch, contactors, overload relays, switch fuses, light sequencer, push button on off switches, indicating lamps etc. complete with internal wiring. Lighting system shall be connected by a separate switch. |
| 8 | FOUNTAIN - 3Designing, supplying, Installation & Testing of not less than 4 mtr dia ring fountain with not less than 40 nos. ball joint. Nozzles are made of Brass- nickel/Chrome plated. High quality All Nuts & bolts and foundation bolts along with control valves to adjust flow pressure. With FRP statue in center as shown in pic below. (FRP statue can be chosen as per client we have considered life size approx. 5 ft height statue).Designing, supplying, Installation & Testing of Pump set & electric panel comprise of not less than 5 HP monosumbersible pump set (Kirloskar/Crompton/Equivalent. Panel comprises of motor main switch, contactors, overload relays, switch fuses, light sequencer, push button on off switches, indicating lamps etc. complete with internal wiring.Lighting system shall be connected by a separate switch. |
| 9 | Replacing broken railing with ss railing on the bridge |
| 10 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.(Site preparation) |
| 11 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light rollermake the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge. |
| 12 | Supplying and stacking of good earth at site complete . |
| 13 | Supplying and stacking at site dump manure from approved source :Screened through sieve of I.S. designation 16 mm |
| 14 | Supplying and stacking at site dump manure from approved source :Screened through sieve of I.S. designation 4.75 |
| 15 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paidseparately). |
| 16 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge |
| 17 | Providing and stacking of Alternanthera species of height 15 cm to 20 cm, full of branches and foliage in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the engg-in-charge.(plantation materials) |
| 18 | Providing and stacking of summer & rainy seasonal seedling at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos plants as per direction of the officer-in-charge.Portulaca hybrid |
| 19 | Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 15 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge. |
| 20 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserviceable material’s as per direction of officer in charge (excluding cast of plant & water) Shrubs Plants |
| 21 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserviceable material’s as per direction of officer in charge (excluding cast of plant & water) Hedge Plant |
| 22 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)(Excavation for plantation) Holes 60 cm dia, and 60 cm deep |
| 23 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)(Excavation for plantation) Holes 45 cm dia, and 45 cm deep |
| 24 | Supplying, installation, testing and commissioning of modern outdoor decorative lamp post of 3.0–4.0 m height, fabricated in mild steel / aluminum, hot-dip galvanized and powder coated in approved shade. Pole to have a clean, straight profile with slim base and integrated junction box, designed for mounting single LED luminaire (25–60 W, IP65, IK07, surge protection) with clear diffuser.Complete with RCC foundation, anchor bolts, and earthing, as per manufacturer’s design and relevant IS standards, including all accessories and wiring (LAMP POST) Adding foundation (1:2:4 ) |
| 25 | Removing existing lamp posts & foundation including disposal . |
| 26 | Supplying, installation, testing and commissioning of outdoor surface-mounted low-profile LED ground light , 7W, 3000K (warm white), with narrow beam optics 10°–25°, housed in die-cast aluminum body with corrosion-resistant powder coating and tempered glass cover, IP67–IP68 dust and water protection, IK08–IK10 impact resistance, integrated driver and surge protection. Fixture shall be bolted on a concrete/paver foundation using anti-theft fasteners, with concealed cabling entry via bottom gland. Complete in all respects including anchoring, accessories.Wiring and civil to be paid separately.(uplight) |
| 27 | Supplying, installation, testing and commissioning of outdoor surface-mounted low-profile LED ground light, 7W to 30W, 3000K (warm white), with narrow beam optics , housed in die-cast aluminum body with corrosion-resistant powder coating and tempered glass cover, IP67–IP68 dust and water protection, IK08–IK10 impact resistance, integrated driver and surge protection. Fixture shall be bolted on a concrete/paver foundation using anti-theft fasteners, with concealed cabling entry via bottom gland. Complete in all respects including anchoring, accessories.Wiring and civil to be paid separately.(uplight) |
| 28 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size |
| 29 | 2 core armoured copper cable and earthing |
| 30 | LED High Bay Light 100W - 10000 LUMENS -IP65 - 5000K (Gym area) |
| 31 | Wiring for light points in shed using in with accessories, including modular switch, ceiling rose/holder, connections, testing and commissioning, complete as required, as per direction of the Engineer-in-Charge.(Gym area) |
| 32 | Cleaning of stone cladding on gazebo by scrubbing/washing with soft nylon brush, water jet and approved mild cleaning solution to remove dirt, stains, moss and algae, including providing and fixing necessary scaffolding, disposal of all waste to designated location, and finishing with clean dry cloth wipe to restore original appearance, complete as per direction of Engineer-in-Charge.(StoneGazebo) |
| 33 | Replacing broken stone balustrades in gazebo including carefully dismantling the damaged baluster, cleaning the base, fixing new stone balustrade of matching size, colour and profile in cement mortar 1:4 (1 cement : 4 coarse sand) with proper alignment, finishing the joints with cement slurry/white cement mixed with matching pigment, curing, and disposal of unserviceable material to designated location, complete as per direction of Engineer-in-Charge. |
| 34 | Dismantling tile work in floors, wall and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm |
| 35 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. |
| 36 | Supplying, installation, testing and commissioning of outdoor playground equipment including (i) Iron Outdoor Garden Swings, 2-Seater type – 2 Nos., fabricated from heavy-duty MS pipes/sections with powder-coated finish, complete with chains, seats and anchoring arrangement, (ii) Straight Iron Playground Slides – 2 Nos., outdoor grade, fabricated in MS frame with powder-coated sliding sheet, ladder and safety rails, (iii) Iron Playground See-saws – 2 Nos., 2-Seater type, fabricated in MS sections with pivot mechanism, powder-coated finish and safety handles, and (iv) Outdoor Playhouses – 2 Nos., prefabricated MS or Plastic structure with all accessories, supports, foundations, anchoring bolts and painting, installed at site including all labour, tools, materials, loading/unloading, fixing, grouting, and finishing, all complete as per direction of Engineer-in-Charge. |
| 37 | Cleaning of stone/concrete benches by scrubbing with soft nylon brush and washing with water jet/approved mild cleaning solution to remove dirt, stains, moss, algae etc., including wiping and polishing with dry cloth to restore clean appearance, and disposal of all waste to the nearest designated dumping ground, complete as per direction of Engineer-in-Charge. |
| 38 | Supplying and fixing heavy duty outdoor garden dustbin of approved make, manufactured from UV-stabilized HDPE/FRP, weather and impact resistant, with lid and provision for anchoring in ground/pedestal, including all labour, materials, tools & plants, complete as per direction of Engineer-in-Charge. |
| 39 | Providing, installing, testing and commissioning of dry deck fountain comprising stainless steel (SS-304/316), jet nozzles with SS cover plates flush with finished paving, underground balancing tank in RCC/FRP of adequate capacity complete with suction strainers, foot valves, non-return valves, submersible/centrifugal pump set of suitable discharge, electrical cabling in conduits with junction boxes, manual control panel with MCBs, starters and protection devices, all accessories, fittings, supports and fixtures including testing and commissioning complete as per specifications and direction of Engineer-in-Charge.(Water body ) Please Enable Macros to View BoQ information |