| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 2 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster |
| 4 | (B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(4)Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding 'P' or 'S' trap (excluding cost of concrete for fixing).(ii) 530 mm X 410 mm |
| 5 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 39. Supplying, fitting & fixing best quality digital printed Ceramic tiles in coloured decorative on walls and floors to match with the existing work & 4 nos. key stones (10mm) fixed with adhesive 4.5 mm thick at the back of each tile & finishing the joints with white cement mixed with colouring oxide if |
| 6 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(17)18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick (avg) cement mortar (1:4) in floor, stair & lobby including pointing in cement slurry with admixture of pigment matching the stone shade, including grinding & polishing as per direction of Engineer - in - charge to match with the existing work. [Slurry for bedding @ 4.4 kg/Sq.m and pointing @2.0 kg/Sq.m](Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m |
| 7 | BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR WINDOW FRAME 3. Supplying, fitting and fixing fibre reinforced polymer (FRP) Composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to safisfy IS: 4020 door testing performance criteria (i) 66mm x 90mm |
| 8 | BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR WINDOW SHUTTER 14. Supplying, fitting & fixing fibre reinforced polymer (FRP) Composite door shutters as per approved design with glass fibre reinforced plastic moulded skins and a special sandwich core, so as to impart monolitaheic composite structure as per approved technology of Department of Science and Technology (DST) to satisfy IS:4020 door testing performance criteria. In ground floor (ii) 25 mm thick (For upper floors refer to item H(4) also) |
| 9 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 4. Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (a) 40mm X 6mm, 250mm Length (The concreting will have to be done for equivalent thickness of 2 layers of brick work and for the entire width of the wall. No deduction on brick work will be made). |
| 10 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 8. Iron socket bolt of approved quality fitted and fixed complete. (c) 150mm long x 10mm dia bolt. |
| 11 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 5. Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark (ii) 50mm. X 40mm. X 2.5mm. (Add Extra 30% for Oxidised Fittings) |
| 12 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 24 (A) Iron door ring of approved quality fitted and fixed with nut and washer complete. (i) 50mm dia. |
| 13 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(6)(a)Cleaning the walls and ceiling by scraping, sand papering and smoothening down the surface including putting. |
| 14 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER 7 Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (b) Two Coats i) Water based interior grade Acrylic Primer[This item to be done under specific instruction of the Superintending Engineer] |
| 15 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats |
| 16 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (b) Two Coats [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C |
| 17 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) c) Super Protective 100% Acrylic Emulsion.N.B. The items [17 (b) & 17(c)] of subhead A are to be selected only with written permission of Superintending Engineer for very resticted and small areas of a building. |
| 18 | Sub Total |
| 19 | GST 9% |
| 20 | GST 9% |
| 21 | CESS 1% Please Enable Macros to View BoQ information |