| 1 | Excavation for foundation /pipe trenches in earth, soils of all types, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. MJP SSR 2023-24 P.No. 37 lieam no. 1 |
| 2 | Item No. Excavation for foundation /pipe trenches in Murrum including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) |
| 3 | Item No.3 Excavation for foundation /pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below. stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A4/259) Iteam no. 5 |
| 4 | Item No.4 Providing and laying in situ 1:2:4 (M-150) Grade of c.c. of trap/ granite/ quartzite/gneiss/ metal for foundation and bedding including dewatering, formwork, compaction, and curing, finishing Etc. complete. With initial lead of 1.50 M below /above G.L.as per MJP/SSR/2023-24 / Section G Plain, reinforced and ready mix concrete / Item No.1 (b)/Page no.47 |
| 5 | Item No. Providing second class Burnt Brick masonry with conventional/I.S. type bricks in cement mortar 1:6 in plinth as composite backing in masonry including bailing out water manually, striking joints, raking watering out joints and etcComplete. Spec. No. |
| 6 | Item No.6 Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. Spec. No. Bd. L.2 Page No. 368 PWD S.S.R. 2022-23 I.No. 32.04 P.No. 209 |
| 7 | Item No.7 Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985/1988 including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site and stacking the same in closed shed duly protected from sun rays and rains Including cost of jointing material i.e. solvemt cement, etc, complete (selffit type to be jointed with cement solvent). Working Pressure 110MM PVC 6kg/cm2 PIPE |
| 8 | Item No.8 PVC TEE (As per Market rate) |
| 9 | Item No.9 Providing and laying in situ Cement Concrete of trap/granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal form dewatering, work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or reinforcement) MJP/ SSR/2023-24/ Section G Plain, reinforced and ready mix concrete / Item No.2/ Page no.47 Tor |
| 10 | Item No.10 Providing and fixing in position steel reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, arches, etc. as per detailed fins, drawings and designs, schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as etc. complete required, (including cost of binding wire). (Bd-F-17/306) MJP/SSR/ 2023-24/ Section G Plain, reinforced and ready mix concrete |
| 11 | Item No.11 Providing and filling in sand boxing in pipeline or for foundation with sand of approved quality including watering and compaction, etc complete (Bd-A-13/264) MJP SSR 2023-24 i. no 19 pg no |
| 12 | Unit Please Enable Macros to View BoQ information |