| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 withhydraulic excavator of 0.9 cum bucket capacity includingcutting, trimming bottom and side slopes, in accordancewith requirements of lines,grades and cross sections,including all lifts and combined lead upto 30m |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days. |
| 3 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 |
| 4 | RCC Grade M20, With Batching Plant,Transit Mixer and ConcretePump. |
| 5 | RCC Grade M25,With Batching Plant,Transit Mixer and ConcretePump, |
| 6 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications,RCC Grade M25,Height upto 5m, With Batching Plant,Transit Mixer and Concrete Pump. |
| 7 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification,Sandy material |
| 8 | Supplying, fitting and placing HYSD bar reinforcement insuper-structure complete as per drawing and technicalspecifications. |
| 9 | Furnishing and Placing Reinforced/ Prestressed cement concrete insuper-structure as per drawing and Technical Specification, RCC Grade M 30-For solid slab,Using Concrete Mixe, For Solid slabsuper-structure-including centering and shuttering,Height up to 5m |
| 10 | Preparing watering and ramming surface for laying concrete,Head work,Horizontal |
| 11 | Dismantling brick work tile, masonry or tile lining,In cement |
| 12 | Dismantling concrete,Reinforced cement concrete |
| 13 | Any other Item Please Enable Macros to View BoQ information |