| 1 | S & F in replacement of PVC weather proof, hinged door, junction box with, 240V, Neutral link, three phase connector, with IP 66/67 protection suitable for outdoor installation on pole/wall surface and including with 1No MCB SP of 6 Amps, necessary fixing arrangement such as clamps, nut, bolts, etc including dismantling old unserviceable junction box complete all as specified and directed. (Make : Sintex Cat Part No. GSMB 2520, Hensel Cat Part No KF 2500H or equivalent of ISI Mark as approved) |
| 2 | M&L for preparation of surfaces for LT pole painting by scrapping damaged paint and painting with two coats of silver aluminium paint and writing pole No with black paint on yellow circuit each of 15 cm complete all as specified and directed. |
| 3 | M&L for Cable jointing kit for LT straight through heat shrink type joint complete with jointing material and accessories suitable for 3.5 core XLPE armoured aluminium conductor cable of size 70 to 120 sqmm complete all as specified and directed. |
| 4 | All as per item No. 3 above, but for 3.5 / 4 core XLPE armoured aluminium conductor cable of size 25 to 50 sqmm complete all as specified and directed. |
| 5 | All as per item No. 4 here-in-before, but for 4 core XLPE armoured aluminium conductor cable of size 10 to 16 sqmm complete all as specified and directed. |
| 6 | M&L in repair for LT Panel outer doors shall be made out of 3.15mm thick CRCA Sheet factory fabricated locable / openable by keys or nuts locking system as per existing one. The degree of protection of outer doors shall be IP-54 and painting the complete panel from out side as per the existing colour complete all as specified and directed. Note:- Measurement of doors shall be taken before ordering to the suppliers/ manufacturer. |
| 7 | S&F in repair Digital type Voltmeter 0-500 Volt, Three Phase Class 1.0 panel mounted 96 x 96 Sqmm, flush mounted case complete with necessary fixing complete all as specified and directed. |
| 8 | S&F in repair ammeter 0-250 Amps, Digital type, Three Phase Class 1.0 panel mounted 96 x 96 Sqmm, flush mounted case with suitable size of CT complete with necessary fixing complete all as specified and directed. |
| 9 | S&F in repair LED indicator (colour red/yellow/blue/white/green) complete all as specified and directed. |
| 10 | S&F in existing panel for replacement of 4 pole on load changeover switch (I-O-II), for open execution of capacity 125 amps, complete all as specified and directed. |
| 11 | S&F in existing panel for replacement of 4 pole on load changeover switch (I-O-II), for open execution of capacity 200 amps, complete with necessary fixing complete all as specified and directed. |
| 12 | M&L for taking out old unserviceable MCCB TPN/FP from existing Feeder pillar/ LT panel board and S&F MCCB TPN/FP 63 amps capacity, rup capacity 16 KA, 415Volt s, 50 Hz including necessary modification in panel board for incoming and outgoing cable connection with replacement of brunt lugs of suitable size for aluminium conductor cable, nuts bolts etc complete all as specified and directed. |
| 13 | All as per Item No 12 above, but 100 amps capacity, 16 KA complete all as specified and directed. |
| 14 | All as per Item No 12 here-in-before, but 125 amps capacity, 16 KA complete all as specified and directed. |
| 15 | All as per Item No 12 here-in-before, but 160 amps capacity, 36 KA complete all as specified and directed. |
| 16 | All as per Item No 12 here-in-before, but 200 amps capacity, 36 KA complete all as specified and directed. |
| 17 | All as per Item No 12 here-in-before, but 250 amps capacity, 36 KA complete all as specified and directed. |
| 18 | All as per Item No 12 here-in-before, but from 350 amps to 400 amps capacity, 36 KA complete all as specified and directed. |
| 19 | M & L for pole Earthing complete with galvanized steel earth plate electrode 60 cm X 60 cm X 6 mm thick buried directly in ground (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of plate not less than 1.5 mtr below ground level connecting to the galvanised iron strip 25×4mm, by means nut bolt, nuts, check nuts and washer of the GI Earth wire protected by provision of GI light grade pipe 15 mm, GI light grade 20 mm bore pipe for watering perforated at bottom 1.75 mtr long placed on top edge of earth plate, common salt and charcoal filling, test point made out of phosphorus bronze with fixing arrangement, funnel, wire mesh and earth work in hard/dense soil, returning filling in and removal of surplus soil to a distance not exceeding than 50 mtr, all as per electric plate No 3 of SSR Part I 2009 and connection to earth test point all as specified incl testing on completion” complete all as specified and directed. |
| 20 | All as per item No. 19 above, but using 32 x 6 mm thick GI strip complete all as specified and directed. |
| 21 | M&L in repair galvanized iron strip of size 25 x 4 mm as earth continuity conductor buried in ground or fixed to wall/floor/ground provided with porcelain insulators space no less than 0.5 mtrs complete all as specified and directed. |
| 22 | All as item No 21 above, but galvanized iron strip of size 32 mm x 6 mm complete all as specified and directed. |
| 23 | M&L for online dehydration, filtration and cleaning of transformer oil, isolation transformer/ Servo voltage stabilizer etc at different locations by suitable dehydration plant testing of oil sample before and after dehydration for each transformer/equipment and results of transformer insulation oil minimum upto 11 KV with 2.5mm gap, recorded jointly by contractor and Engineer-in-Charge complete including all necessary tools, plants, transportation etc complete all as specified and directed. Note :- (i) Oil for toping up/fresh fill shall be measured and paid separately under relevant item. (ii) Certificate for oil testing result before and after filtration shall be submitted. |
| 24 | M&L for toping up oil level with and including new insulating oil confirming to IS-335 including all necessary tools, plants, transportation etc complete all as specified and directed. Note :- (i) Certificate from manufacturer for oil testing result shall be submitted to Engr-in-Charge immediately after topping up. |
| 25 | M&L for preparation of surfaces for steel poles painting of any size by scrapping damaged paint and painting with two coats of silver aluminium paint and writing pole No with black paint on yellow circuit the bottom of pole to be painted with yellow and black paint as per the existing complete all as specified and directed. |
| 26 | All as per item No 25 above, 2 pole structure complete with all structural steel complete all as specified and directed. |
| 27 | All as per item No 25 here-in-before, 4 pole structure complete with all structural steel complete all as specified and directed. |
| 28 | M&L for re-stringing of ACSR conductor and removing unwanted sagging including trimming of trees branches 1.5 mtr clearance form OH conductor. One span between two poles is considered as one job complete all as specified and directed. |
| 29 | M&L for preparation of surfaces for Isolation transformer/Servo Stabilizers of any type or capacity, painting by scrapping damaged paint and painting with two coats of suitable paint as per existing one and writing MES/MS No. with white paint on black circuit complete all as specified and directed. Please Enable Macros to View BoQ information |
| 30 | M&L for preparation of surfaces for Isolation transformer/Servo Stabilizers of any type or capacity, painting by scrapping damaged paint and painting with two coats of suitable paint as per existing one and writing MES/MS No. with white paint on black circuit complete all as specified and directed. Please Enable Macros to View BoQ information |