| 1 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (But Excluding GST) |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (as per MORT&H Specification No. 301, Sl. No. 3.06) (But Excluding GST) |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per MORT&H Specification No. 305, Sl. No. 3.17 (But Excluding GST) |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (But Excluding GST) |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Sl.no.4.01B (But Excluding GST) |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MORT&H Specification No. 406 Sl.no.4.14B in Two layers (But Excluding GST) |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.(But Excluding GST) |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (But Excluding GST) |
| 9 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MORT&H Clause 503 Sl. No. 5.02 (ii) (But Excluding GST) |
| 10 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 Sl. No. 5.05B complete in all respects (But Excluding GST) |
| 11 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & 3 Km. leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 as per MORT&H Specification.305, Sl.no.3.18 (But Excluding GST) |
| 12 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORT&H Specification No. 304, Sl. No. 15.01 (But Excluding GST) |
| 13 | Stone dust Filling in Foundation Trenches as per Drawing & Technical Specification No. 304 S.l No. 15.03 (But Excluding GST) |
| 14 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification No. 2100 S.l No. 12.4) (But Excluding GST) |
| 15 | Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (But Excluding GST) |
| 16 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications No. 1400 & 2200 Sl. No. 15.10 (But Excluding GST) |
| 17 | Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC grade M 20) (Case-I: Using concrete Mixer (As per MoRT&H Specification No. 1500, 1700 & 2100) Sl. No. 15.11 B Case II (But Excluding GST) |
| 18 | RCC Grade M25 using batching plant transit mixer & concrete pump (But Excluding GST) |
| 19 | RCC Grade M30 using batching plant transit mixer & concrete pump (But Excluding GST) |
| 20 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. MORT&H no. 1600 Sl. No. 15.13) (But Excluding GST) |
| 21 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (But Excluding GST) |
| 22 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications (But Excluding GST) |
| 23 | Pointing with cement mortar (1:3) on brick RCR in substructure as per Technical Specifications MORT&H no. 1300 & 2200 Sl. No. 15.08) (But Excluding GST) |
| 24 | For Diviresion supply and fixing of 1000mm dia pipe (But Excluding GST) |
| 25 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (But Excluding GST) |
| 26 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (But Excluding GST) |
| 27 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) (Excluding GST) (But Excluding GST) |
| 28 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) (Excluding GST) (But Excluding GST) |
| 29 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) (But Excluding GST) |
| 30 | The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1.00% Construction Cost) (But Excluding GST) Please Enable Macros to View BoQ information |