| 1 | TALAB SONDRIYAKARAN AND DEWATRING |
| 2 | Dewatering of water of talaab by diesel pumping set with 5 HP motor including supply of all material,labour and T&P etc.required for proper completion of work,LS |
| 3 | Excavation in soil mixed with moorum/shingle/kankar and Sludge,silt sand and clay/Garbage in pond including lift upto 1.50M and lead upto 30M including loading,unloading transport/ cartage charges to dumping groung upto distance 1.00 km by tractor trolly ,buggi or dunkey including labour T & P and all complete of work CHpt-4/252 l= 84.00-6.00= less pit area less platform h=3.50+2.50/2=3.00 |
| 4 | Disposal of Excavated material up to 500 km distance by tractor trolly ,buggi or dunkey including labour T & P and all complete of work CHpt-3/231a |
| 5 | Earth work in cutting or in embankment in ordinary soil excavation to be tha form regular pits not exceeding 0.50m, in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and lopes and also including 1.5 M lifgt and 30M lead the earth from cutting to be used in making embankment or to be deposited as sopil banks with-in 30M distance as directed by the Engineer incharge( royalty removed by Govt) for small works/abadi area ( where machine can not move) 253a l=84.00-6.00= less pit area lessplatform h=3.50+2.50/2=3.00 |
| 6 | Add sign board |
| 7 | Earth work Excavation in ordinary soil including lift upto 1.50M and lead upto 30M including loading,unloading transport/ cartage charges to dumping groung upto distance 1.00 km by tractor trolly ,buggi or dunkey including labour T & P and all complete of work CHpt-4/251 column |
| 8 | Concrete in 1:6:12 with cement,fine sand with brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-5/273 rccwall |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in r.c.c raft foundation and footing including supply of all material,labour and T&P etc.required for proper completion of work, Chpt-5/287a raft footing |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Plinth beam including supply of all material,labour and T&P etc.required for proper completion of work, (Chpt-5/285) plinth beam |
| 11 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in column including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-5/289 column column |
| 12 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in slab including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-5/284a column |
| 13 | Mild steel or iron work such as reinforced including supply of all material,labour and T&P etc.required for proper completion of work,as per sale raft footing plinth beam column &rcc wall |
| 14 | M-150 brick work in 1:4 with cement coarse sand including supply of all material,labour and T&P etc.required for proper completion of work,Analysis foundation |
| 15 | M-150 brick work in 1:3 with cement coarse sand in superstructure including supply of all material,labour and T&P etc.required for proper completion of work,Asper analysis wall gate |
| 16 | 12mm thick plaster in 1:4 with cement coarse sand including supply of all material,labour and T&P etc.required for proper completion of work,asper analysis wall wall top |
| 17 | Apply wall putti over new work including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-15/New qty as per plaster area |
| 18 | Two coat approved weatehr paint including supply of all material,labour and T&P etc.required for proper completion of work Chpt-15/new qty as per plaster area |
| 19 | Concrete in 1:2:4 with cement,coarse sand with aggregate 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-5/279a |
| 20 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 21 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 22 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work |
| 23 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Grey tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work |
| 24 | Mild steel or Iron work such as Railling & MS gate including supply of all material,labour and T&P etc.required for proper completion of work,asper sail railling |
| 25 | Earth work in filling up to 10km distance including supply of all material,labour and T&P etc.required for proper completion of work,H=2.00+1.50/2= Deduction 12.5% Settelment |
| 26 | Providing & Planting tree |
| 27 | Supply and fixing of RCC benches with paint inc all complete of work |
| 28 | Add Sign board |
| 29 | S/f of 7.0mt. GI Octagonal Pole of approved make top dia 70mm bottom 130mm thickness of the pole sheet must be 3.0mm the base plate size 220x200x12mm PCD-220mm including foundation assories et etc. S.R.21.2 21657*0.8475 |
| 30 | S/f of LED Street light fitting having die cast aluminium body and diffuser/Reflector with driver set suitable for 75 to 90 Watt.. Confirming to IP-66 protection complete in all respect. (23.16 7259.64*0.8475 |
| 31 | S/L of 16sqmm 2core aluminium conductor PVC insulated armored served sheathed cable 1100 Volte grads as a dept of below ground level over cushion of 750mm below ground complete in all respects. S.R.501© |
| 32 | Supply and wiring of submains with two nos of 6sq mm FRLSH PVC insulated 1100 V grade two core multistrand copper conductor cable in existing conduits complete supply opf all material 20.c.1.1 185*0.8475 |
| 33 | S/L of 40mm die heavy duty PVC pipe etc. Complete in all respect. 284a |
| 34 | S/F of plain or pin type aluminium lug to the cable Leeds included with tape and making connection etc. S.R.504(E) |
| 35 | S/F of 6 Amp to 32 Amp.SPMCB (10KA) C Curve, SR 1002 |
| 36 | Supply and fixing automation street light cubical control panel painted with anti corrosive and acid proof pain. HRC fuse insulation switch metering complete in all respects. Sch.807(f) |
| 37 | Earthing with copper earth plate of 600x600mmx3mm including accessories, and providing masonary enclosure with cover plate having locking arrangement and watering pipe of 2.7 mtr long etc. with charcoal/ coke and salt as requitred, DSR 2022(Chpt-5/5.6) |
| 38 | gst Please Enable Macros to View BoQ information |