| 1 | Earth work excavation in hard soil mixed with boulder for foundation of Protection Wall including all lead & lift with proper completion of work. |
| 2 | Earth work excavation in sand stone, lime stone or other soft rock by pick axex but not required blasting for removing overburden including all lead & lift with disposal of excavated boulder as per the direction of Engineer In Charge. |
| 3 | Removing Soil mixed with boulder from canal bed which have fallen during overburden removal from right bank up including all lead & lift by truck or tractor trolley or any other power transport with proper completion of work as per the direction of Engineer In Charge |
| 4 | Earth work in excavation for lining work in sand stone, lime stone or other soft rock by pick axex but not required blasting for slope Lining including all lead & lift by truck or tractor trolley or any other power transport , with proper completion of work As per the direction of Engineer In Charge. |
| 5 | Earth work in filling for Ramp Formation with proper dressing and manual compaction including all lead & lift required for proper completion of the work. |
| 6 | Earth work in filling for pitching near patulaki VRB with proper dressing and manual compaction including all lead & lift required for proper completion of the work. |
| 7 | Earth work Excavation in Ordinary Soil for Removal of Ramp including all lead and lift and disposal of excavated earth with proper completion of work As per the direction of Engineer In Charge. |
| 8 | Drilling 35 mm dia holes upto 5 M deep @ 1.5M C/C both way in staggered form including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. |
| 9 | Drilling 50 mm dia drainage holes upto 5 M deep @ 3.65M C/C both way in staggered from including all lead and lift, labour and T&P etc, with proper completion of work. |
| 10 | Furnishing and installing 25mm dia bar in rock bolt upto 5 M deep in drill hole including installation of MS Plate of Size 150x150x10 mm ,Nut of 25 mm NB , threading of projected portion and including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. |
| 11 | Furnishing and installing 40 mm dia perforated CPVC pipe and pipe fittings in grout / drainage holes including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge |
| 12 | Providing and Fixing of Welded wire mess ( size100 mm x100 mm, with 3.00 mm dia GI wire) including all lead and lift, labour and T&P etc, with proper completion of work & as per the direcrion of Engineer-In- Charge. |
| 13 | Shotcreting on surfaces average 20 cm thick having Volumetric composition of 1: 3 : 1 (Cement:sand:Coarse Aggregate) including cost of admixture and shotcreting Machine including all lead and lift, labour and T&P etc as per the IS 9012-1978 (reaffirmed 2002)specifications, with proper completion of work & as per the direcrion of Engineer-In- Charge. |
| 14 | Preparation of Subgrade Before laying of lining excluding cost of earth work |
| 15 | Centering and shuttering for C.C. work including cost of all materials, labour T&P etc. required for proper completion of work. |
| 16 | Providing and Laying C.C. M-15 (1:2:4) in sleepers, cut off wall,Protection apron,coping and wearing coat with cement coarse sand of FM more than 2.0 and crushed hard stone grit of size 4.75 to 20 mm including cost of materials, labours, T& P etc. required for proper completion of work. but excluding cost of centering and shuttering in construction of different part of structure. |
| 17 | Painting on top of sleeper with two coats of bitumen (Blown Type petroleum bitumen of 85/25 grade) including cost of materials, fuel for heating labour, T & P etc. required for proper completion of work & as per the direcrion of Engineer-In- Charge. |
| 18 | Providing and laying Coarse sand below CC lining in cutting section and below Stone pitching as per Drawing including cost of all materials, labour charges & T&P etc. |
| 19 | Providing and laying of 150 micron LDPE film in side slope before laying of concrete in lining including cost of all material, labour, T & P etc. required for proper completion of work. |
| 20 | Providing & laying 150mm wide & 6 mm thick PVC water stop seal at panel joints including cost of all material, labour, T&P etc. required for proper completion of work. /RM & as per the direcrion of Engineer-In- Charge. |
| 21 | Providing and laying C.C. M-15 (1:2:4) 100 mm. thick CC lining with coarse sand of FM. not less than 2.0 and 4.75 mm to 20. mm size graded hard stone grit with cost of material, all lead and lift, labour, T&P etc. required for proper completion of work & as per the direcrion of Engineer-In- Charge. . |
| 22 | Making construction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all materials, fuel for heating labour, T & P etc. required for proper completion of work. |
| 23 | Laying P C.C. 1:3:6 in foundation with 1 cement :3 sand, 6 stone ballast size 20 to 40 mm including all cost of material labour T&P etc., lead and lift Complete. |
| 24 | C.R. stone (Khanda) masonary with 1:3 cement, coarse sand mortor including cost of all material, labour and T&P etc. with all lead and lift for proper completion of work. |
| 25 | Deep struck Cement pointing 1:2 C.M. including cost of all materials,T&P etc required for proper completion of work. |
| 26 | Dismantling stone work in cement mortar including stacking of dismantaled materials for Patulaki minor Crossing as directed by Engineer-in-Charge within a distance of 60 mtr. |
| 27 | Centering & Shuttering for R.C.C. work in Patulaki minor Crossing including Rent of shuttering material, labour and T&P required for proper completion of work. |
| 28 | Cutting bending, binding and placing reinforcement in position including cost of all material, labour, T&P binding wire etc. required for proper completion of work in Patulaki minor Crossing. |
| 29 | Providing and laying R.C.C. M-20 with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size including cost of material, labour, T&P etc. required for proper completion of work in Patulaki minor Crossing. |
| 30 | Providing weep holes in protection wall with 90 mm dia P.V.C pipe extending through the full with of structure including cost of material, labour, all lead & lift, T&P etc required for proper completion of work in Patulaki minor Crossing. |
| 31 | Providing and laying filter media 600 mm thick in back filling with stone ballast 20 to 40 mm size , stone grit 4.75 to 20 mm size and Course sand including cost of material, labour, all lead & lift, T&P etc required for proper completion of work in Patulaki minor Crossing. |
| 32 | Laying stone (25 to 60 kg weight) pitching with R.R Stone masonary in 1:4 cement mortor in slope of embankment near Patulaki Minor Crossing including cost of all material, labour, T&P binding wire etc. required for proper completion of work. |
| 33 | Cement plaster 1:3 C.M. on stone masonary in Rain chute near Patulaki Minor Crossing including all lead and lift, cost of all materials, labour, T&P etc required for proper completion of work. |
| 34 | Dewatering of Surface water in the internal section of canal including cost of all material, labour, T&P etc. required for proper completion of work Please Enable Macros to View BoQ information |