| 1 | Remuneration for |
| 2 | (a) Professional Key Personnel |
| 3 | (b) Sub- Professional Key Personnel |
| 4 | Remuneration for Supporting Staff |
| 5 | Transportation |
| 6 | (a) Duty Travel to Site |
| 7 | Office Rent |
| 8 | Office Supplies, Utilities and Communication |
| 9 | Office Furniture and Equipment |
| 10 | Reports and Document Printing |
| 11 | Road Survey Equipment |
| 12 | Contingencies |
| 13 | %Overhead of the firm on S.No. I to IX above. (The % overhead cannot be quote@ less than 10%. If remuneration quote @ less than 10%, the financial proposalwill be non-responsive and will not be considered for further evaluation. |
| 14 | Sub Total |
| 15 | Goods and services tax payble in india |
| 16 | A. Key Personnel (20.1) |
| 17 | Team Leader cum Senior Highway Engineer |
| 18 | Resident cum Highway Engineer |
| 19 | Bridge/Structural Engineer |
| 20 | Senior Pavement Specialist |
| 21 | Senior Quality cum Material Expert |
| 22 | Contract specialist cum Planning Engineer |
| 23 | Road Safety Expert |
| 24 | Sub Total |
| 25 | B: Sub Professional Staff (20.2) |
| 26 | Survey Engineer |
| 27 | Assistant Highway Engineer (2no) |
| 28 | CAD Expert |
| 29 | Environmental Engineer |
| 30 | Assistant Bridge Engineer (01 no) |
| 31 | Assistant Quality cum Materail Engineer (02 no) |
| 32 | Electrical Enigineer |
| 33 | Quantity Surveyor |
| 34 | Lab Technician (2 nos.) |
| 35 | Horticulture cum Landscaping Expert |
| 36 | Document/Data entry operator |
| 37 | Sub Total |
| 38 | Office Manager |
| 39 | Accountant cum cashier |
| 40 | Steno cum Computer Operator |
| 41 | Office Boy (1 no) |
| 42 | (2)Innova or equivalent 4000km/month |
| 43 | (2) Bolero or equivalent 4000KM/month |
| 44 | 1 Pick up Van 4000 km/month |
| 45 | professional and sub professional staff trips |
| 46 | During Construction Period |
| 47 | Minimum 200 sqm area of office shall be Rented. The rent cost includes electricity and water charges,maintainance,cleaning,repairs, etc complete |
| 48 | Office Supplies |
| 49 | Drafting Supplies |
| 50 | Computer Running Costs |
| 51 | Domestic and International Communication |
| 52 | Office Furniture and Equipment(Rental) |
| 53 | Office Furniture and Equipment ( Rental ) |
| 54 | Monthly reports (Design Construction and Maintance) |
| 55 | Half yearly Reports |
| 56 | Various others reports as provided in the Concession Agreement such as Completion Report |
| 57 | Surface defects detection and roughness measurement using Network Survey Vehicle |
| 58 | Pavement strength measurement using FWD |
| 59 | Bridge inspection using Mobile Bridge Inspection unit |
| 60 | Road signs inspection using Retro Reflectometer |
| 61 | A fixed amount of indian rupees ONE MILLION shall be included in the Financial Proposal. The provisions of contingency shall be operaetd with the specific approval from the Authority. |
| 62 | Description |
| 63 | Amount of Performance Security to be submitted by bidder( Minimum amount to be 5% of the financial quote) Please Enable Macros to View BoQ information |