| 1 | CHARGE FOR DISCONNECTION OF ELECTRIC SYSTEM, DISMANTLING FROM EOT CRANE AND HEAT VARNISHING OF 7.5 KW/10 HP 50 HZ, 415 V, 3 PH. INDUCTION MOTOR WITH SUPPLY OF NECESSARY VARNISH, BALING ETC. INCLUDING TESTING THE SAME FOR THE SAME FOR NO-LOAD AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 2 | CHARGE FOR DISCONNECTION OF ELECTRIC SYSTEM, DISMANTLING FROM EOT CRANE AND REWINDING OF 15 HP,50 HZ, 415 V, 3 PH INDUCTION MOTOR AFTER DISMANTLING THE EXISTING DAMAGE COIL WITH SUPPLY OF NECESSARY COPPER WINDING WIRE OF APPROPRIATE GAUGE MICA LOX PAPER, MICA SHEET OVERHAULING AND HEAT VARNISHING THE SAME AS PER DIRECTION OF EIC INCLUDING TESTING THE SAME FOR ON IOAD AS WELL AS ON LOAD AFTER INSTALLATION. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 3 | CHARGE FOR DISMANTLING THE EXISTING PLUMBER DELIVERY WHEEL BEARINGS, TOOLS HEADGEAR ETC. FOR NECESSARY CHECKUP THE EXISTING CONDITION AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 4 | CHARGES FOR REPLACEMENT OF THE DEFECTIVE COMPONENTS AS PLUMBER BLOCK TOOTHED GEAR BEARINGS ETC. AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 5 | CLEANING OVERHAULING ALL ROTATING UNITS WITH PROPER CASE & APPLICATION OF GRADED GREASE/ LUBRICANT ETC. AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 6 | CHARGES FOR REPLACEMENT OF DAMAGED CABLE NETWORK FOLLOWED BY REMOTE OPERATING INSTRUMENT (IF NECESSARY) AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019 |
| 7 | CHARGES FOR SUPPLYING & FITTING NEW CABLE SUPPLYING CHAIN INCLUDING REPLACING THE OLDER ONE AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 8 | CHARGES FOR CHANGING THE INACTIVE POWER CONTRACTOR UNIT AS PER EXISTING ONE & AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 9 | REPLACEMENT OF DEFECTIVE DIRECTION OF WIRE ROPE CHAIN PULLEY BLOCK (IF NECESSARY) AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 10 | RE-ASSEMBLING OF ALL DISMANTLED ELECTRO/MECHANICAL PARTS AS SAME AS BEFORE WITH PROPER CHECKING ALIGNMENT TESTING &COMMISSIONING AS PER DIRECTION OF ELC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019 |
| 11 | RE-ASSEMBLING OF ALL DISMANTLED ELECTRO/MECHANICAL PARTS AS SAME AS BEFORE WITH PROPER CHECKING ALIGNMENT TESTING &COMMISSIONING AS PER DIRECTION OF ELC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019 |
| 12 | CHECKING THE EFFECTIVENESS OF THE WIRE ROPE PULLEY, BLOCK, CHAIN WIRE FOR ENDURANCE WITH LOAD TESTING AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019 |
| 13 | THROUGH PAINTING OF THE ENTIRE BODY OF EOT CRANE WITH ONE COAT OF PRIMER & TWO COAT OF PLASTIC PAINT APPROVE MAKE AFTER CLEANING THE SURFACE WITH EMERY PAPER AS PER DIRECTION OF EIC. FAIR RATE APPROVED BY DG(WS) ON DATED 02/05/2019. |
| 14 | Sub Total |
| 15 | GST 18% |
| 16 | CESS 1% Please Enable Macros to View BoQ information |