| 1 | SCHEDULE OF RATES FOR OH LINE INSTALLATION (LT DISTRIBUTION).Erection of Poles.Erection of Single Steel tubular pole of length as given below with/without sole plate & Cap etc. in CC foundation (Proportion and dimension indicated below), having 600x600x150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama metal including CC (6:3:1) muffing 0.30 mts. dia and 0.30 mts. above ground level including 3 mm thick neat cemented finish and GI earth bolt after making drilled holes etc. on pole & carriage of pole upto 1.6 Km from Store to work(site including filling up the excavated earth pit with shifted soil and ramming properlyUpto 9.0 mtr. Size 0.6x0.6x1.70 mts |
| 2 | SCHEDULE OF RATES FOR EARTHING INSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:(a)By ISI Medium GI pipe. |
| 3 | S/F single arm projected lamp bracket (Single pipe bending) of 50cm (2\\") diaG.I. pipe (ISI medium) 3.65 mm thick of 2.1 mtr (6' approx) long having 105 degree curvature with reducing socket to be fitted at the top of the pole with bolts, nuts, clamps etc. as required. |
| 4 | S/F of special head type M S loop box (3 mm thick) with connecting bar and other accessories fixed on the top the pole as required and as per direction of Engineer-In-Charge. For 3 phase connection. |
| 5 | Erection of Galv. (HOT Dip) Cross arms/ `D... Iron Clamp7).Supplying & Erection of Galv. `D... iron complete with suitable pole clamp 75mmx88mm porcelain shackle insulator & 15 mm dia Galv. bolts & nuts. incl. painting |
| 6 | Supplying of 1.1 KV. Grade PVC insulated Conductor of following cables (make: Polycab/ Gloster/Havells/):Size in Sq. mm, No & dia. of wire in mm , No of Core - 10 1/3.55 4 |
| 7 | Supply and drawing of 7/14 SWG galvanised stranded wire for drawing unarmored cable (supply of cable is not included in the scope) by catenary system of wiring with 3nos. reel insulator per mtr. and binding with binding wires etc,as reqd. for drawing |
| 8 | Supplying Al.conductor PVC insulated and sheathed unarmoredcable (1.1KVgrade,Gloster/Havells/Polycab). 4sqmm x 2core |
| 9 | Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core |
| 10 | Fixing only Floodlight fittings on top of masonary structure by 3 Nos. 10 mm dia x 87 mm long rag bolts, nuts & double washers complete either 37 mm x 10 mm MS flat support/or by other means as required |
| 11 | Painting Block Letters or Digits within a circle/square as required, with ...Black Japan... paint of(approved make & brand, the size of letters and digits as given below.Size 40 mm and upto 50 mm |
| 12 | A N N E X U R E - I Basic Rate of Materials: (All Rates of materials from K-1 to K-14 are excluding VAT) 145. Galv. Straining screw 12\\"x5/8\\" dia |
| 13 | Drawing of unarmoured cable of suitable size (supply of cable is not included in the scope)on existing Galvanized stranded wire for centenary system with reel insulators and binding wires. |
| 14 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.(i)1st coat of aluminium paint over 1 coat of RO priming |
| 15 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1)e) 410 SP - 9 ; 7.5 Mtr., 110.00 Kg. |
| 16 | 200 WATT LED STREET LIGHTING FITTINGS |
| 17 | SCHEDULE OF RATES FOR OVERHEAD LINE INSTALLATION - REPAIR 14. Dismantling steel tubular/Rail/Strut embedded in CC foundation incl. excavation, filling of holes, restoring surface,loading at site and delivering, unloading, sorting, stacking properly at any place as per direction upto a lead of 1.6 km |
| 18 | 100 WATT LED STREET LIGHTING FITTINGS |
| 19 | Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.ii2nd coat of aluminium paint over 1st coat |
| 20 | Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1) b) 4 SWG ;5.0 mtrs; 45 Kg |
| 21 | 40 WATT LED STREET LIGHTING FITTINGS |
| 22 | Supplying & Erection of big size feeder pillar box of Size (1372 x 914 x 607 mm) made up of 3.15 mm thick MS Plate along with suitable M.S. Angle. The P.B. have double hinge door at the front & back with suitable locking arrangement. The box will be painted by 2 cores of aluminiam paint over 1 coat of red oxide paint. Suitable arrangement should be provided for fixing of Timer unit, fuse unit & other accessories. Leg of the pillar box will be 900 mm in length by made up of (35x35x3 mm MS Angle with suitable base Plate. Legs of the Pillar box will be erected at 300 mm below the ground level with cement concrete (6:3:1). Rest portion coverd by 5\\" Brick Wall with plastering & net cement & bottom portion filled with silver sand as drawing & direction of E.I.C. |
| 23 | Sub Total |
| 24 | GST 18% |
| 25 | CESS 1% Please Enable Macros to View BoQ information |