|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) |
| 5 | First class brick work in foundation and plinthincluding cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 6 | Half brick masonry work with first class bricks infoundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 7 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) Neat cement punning. |
| 8 | Providing and laying in position specified grade ofreinforced cement concrete excluding the cost ofcentring, shuttering, finishing and reinforcement--All work upto plinth level: |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D ormore |
| 10 | Steel work welded in built up section/framed workincluding cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer using steel etc. complete as required:- In grating, frames, guard bar, railing, brackets, gates andsimilar works, all complete. |
| 11 | Centering shuttering including struttings, propping etc. and removal of form work for: Walls (any thickness) including attached pilasters,buttresses, plinth and string courses etc. using shutteringply Please Enable Macros to View BoQ information |