| 1 | Fitting of material at new installation site. |
| 2 | Transportation of gear box, drive head (drive and driven drum), motor, support girders, track line,loading on trolleys, transporting in point nearest to installation with structure complete set (76 to 110 KW, single drive) up to track line loading on trolleys, transporting to point nearest to installation site ,unloading and transporting to place of installation. |
| 3 | Fitting of gear box, drive head (Drive and Driven drum) motor, support girders with structure complete set (76 to 110 KW, single drive ) without grouting material . |
| 4 | Transportation of 3537top rollers from place of stacking up to track line ,loading in tubs and transporting to nearest point of installation, unloading and transporting to installation site. |
| 5 | Transportation of 394bottom rollers from place of stacking up to track line ,loading in tubs and transporting to nearest point of installation, unloading and transporting to installation site. |
| 6 | Loading of belt structure including 792 channels,1179 brackets and 394 stools on trolleys transporting to point nearest to installation site, unloading and transporting to place of installation. |
| 7 | Fitting of loop take up drum, trolley , tracks and winch . |
| 8 | Site cleaning for installation of Drive Head. |
| 9 | Trench cutting In stone for 1000 mm Drive Head portion (For Drive Head,Gear Box, Loop Takeup, Discharge Drum and Switch foundation) |
| 10 | PCC work (1:2:4) for drive head, gear box , loop takeup, discharge drum , tail end drum installation . |
| 11 | Brick work in cement mortar (1:6) up to 1.5m above floor for swith plateform . |
| 12 | 12 mm Cement Plaster ( Mortar 1:6) for swith plateform . |
| 13 | Loading the material in to tub |
| 14 | Unloading of material at destination in UG |
| 15 | Bricks: fly Ash Bricks |
| 16 | Sand : Coarse sand (zone III) |
| 17 | Portland cement (OPC-43 Grade) |
| 18 | Stone Aggregate (single size): 20 mm nominal size |
| 19 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |