| 1 | Earth work in excavation in ordinary soil with pocKlain machine and shifting on the bund by Tractor and Trolly as the directed by the engineer incharge . FILLING IN BERM AND BASE OF BANDHA) |
| 2 | Earth work in excavation in Slush with pocKlain machine and shifting by Tractor and Trolly as the directed by the engineer incharge . |
| 3 | Earth work in excavation in ordinary soil with pocKlain machine and shifting to Gram panchayat by Tractor and Trolly as the directed by the engineer incharge . |
| 4 | Dressing of the bund 100% |
| 5 | Shifted the qty of the Slush and qty hand over to GP up to 1.0 km distance as SI 261(B +231A) . |
| 6 | Class -150 (Non Modular ) brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials labour and T & P etc . Required for proper completion of work ( coarse sand not less than 2.25 FM) |
| 7 | Supply & Laying of 80mm thick interlocking tiles i/c levelling & dressing of surface up to required level & slopes and filling joints with fine sand i/c all materials,labour and T&P etc with the base of 4cm the local sand layer . |
| 8 | E/W in excavation of ordinary soil 1.5 m. lift and 30.00 m. lead in foundation inlet,and ramp out let Complete work. |
| 9 | PCC 1:4:8 INLET + UTLET +RAMP+ INT + FANCING |
| 10 | PCC 1:2:4 INLET +RAMP+outlet+ INT + FANCING |
| 11 | Plaster INLET +RAMP+outlet+ INT + FANCING |
| 12 | Laying of the GSB in the base of Interlocking work rate as per Analysis. |
| 13 | Supply and laying of 900 mm.N.P.-4 R.C.C hume Pipe inlet and o with coller Complete work. |
| 14 | Laying and Fixing NP-4Hume Pipe Proper Position 900 mm Dia |
| 15 | Supply and laying of 600 mm.N.P.-4 R.C.C hume Pipe inlet and with coller Complete work. |
| 16 | Laying and Fixing NP-4 Hume Pipe Proper Position 600 mm Dia |
| 17 | Photography work before during the work on Pond |
| 18 | Dewatering before and during the work on Pond |
| 19 | SUPPLY AND FIXING OF RCC PRECAST/ BENCH |
| 20 | S/F of MS angle of 50*50*6 mm as SI 503. Supplying at site Angle iron post & strut of required size including bottomto be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. |
| 21 | Fencing with RCC Postplaced at required distance GI Binding wiretied to 6mm bar nibs per meter cost of total length of barbed wire as DSR NO 16.18.1 (DSR 2023) |
| 22 | S/F of a Sign Board on Pond site etc. Please Enable Macros to View BoQ information |