| 1 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK |
| 2 | RENDUM RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 3 | RENDUM RUBBLE/ KHANDA MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 4 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20 MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. |
| 5 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC. |
| 6 | RAISED /STRUCK POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OF WING WALL CREST WALL SLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOUR AND T&P |
| 7 | DRY STONE PITCHING /FILLING IN LAUNCHING APRON INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P |
| 8 | A. EARTH WORK IN EXCAVATION IN HARD SOIL ON BANK OF NALA INCLUDING 4 LEAD |
| 9 | A. EARTH WORK IN EXCAVATION BELOW 1.5 DEPTH |
| 10 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL |
| 11 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST, WING WALL, CUT OF WALL APRON,AND FLOOR IN UP AND DOWN STREAM WITH TWO LEAD AND LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M. LIFT OR PART THERE OF |
| 12 | EARTH WORK IN EXCAVATION FOR MAKING DIVERSION CHENNEL |
| 13 | DEWATERING BEFORE STARTING WORK OR IN PERIOD OF WORK TO PREVENT THE STRUCTURE FROM WATER |
| 14 | EARTH WORK IN EXCAVATION FOR MAKING COFFER DAM INCLUDING EXCAVATION OF EARHT AND MAKING BUND TO PREVENT THE STRUCTURE FROM WATER DURING CONSTRUCTION PERIOD IN UP STREAM SIDE |
| 15 | MAKING APPROCH ROAD FOR TRANSPORTATION OF MATERIAL UP TO SITE |
| 16 | DISMENTELING/REMOVING EARTHEN COFFER DAM AFTER COMPLETING CONSTRUCTION WORK OF ANICUT |
| 17 | FILLING OF DIVERSION CHENNEL (NOTE:- SIZE OF DIVERSION CHENNEL IS INCREASED DUE TO SOIL EROSEN DURING CONTINEUE FLOWING OF WATER FROM DIVERSION CHENNEL |
| 18 | PHOTOGRAPHY BEFORE STARTING THE WORK AT SITE ,TIME TO TIME DURING CONSTRUTION WORK AND AFTER COMLETION OF WORK |
| 19 | FIXING OF M.S. SIGN BOARD AT WORK SITE WITH PAINTING AND WRITING INFORMATION ABOUT ANICUT Please Enable Macros to View BoQ information |