|
| 1 | A. EARTH WORK IN EXCAVATION IN HARD SOIL ON BANK OF NALA INCLUDING 2 LEAD |
| 2 | A. EARTH WORK IN EXCAVATION UP TO BED OF NALA WITH 2 LEAD AND 5 LIFT ABOVE 1.50 M FOR EVERY 030M. LIFT OR PART THERE OF |
| 3 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL WITH 2 LEAD AND 1 LIFT UP TO GROUND HEIGHT FOR EVERY 0.30 M .LIFT OR PART THERE OF |
| 4 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST, WING WALL, CUT OF WALL APRON,AND FLOOR IN UP AND DOWN STREAM WITH 2 LEAD AND 10 LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M. LIFT OR PART THERE OF |
| 5 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK |
| 6 | RENDUM RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 7 | RENDUM RUBBLE/ KHANDA MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK |
| 8 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20 MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. |
| 9 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC. |
| 10 | FLUSH/RAISED POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OF WING WALL CREST WALL SLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOUR AND T&P |
| 11 | COURSED RUBBLE STONE MASONARY ON SLOPPY SIDES IN 1:4 CEMENT COURSE SAND AND KHANDA/SPLIT /CUT STONE INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P ETC. |
| 12 | DRY STONE PITCHING /FILLING IN LAUNCHING APRON INCLUDING SUPPLY OF MATERIAL ,LABOUR AND T&P |
| 13 | EARTH WORK IN EXCAVATION FOR MAKING DIVERSION CHENNEL |
| 14 | DEWATERING BEFORE STARTING THE WORK AND DURING THE WORK |
| 15 | MAKING EARTHEN COFFER DAM INCLUDING EXCAVATION OF EARHT AND MAKING BUND TO PREVENT THE STRUCTURE FROM WATER DURING CONSTRUCTION PERIOD IN UP STREAM SIDE |
| 16 | MAKING EARTHEN COFFER DAM INCLUDING EXCAVATION OF EARHT AND MAKING BUND TO PREVENT THE STRUCTURE FROM WATER DURING CONSTRUCTION PERIOD IN DOWN STREAM SIDE |
| 17 | MAKING APPROCH ROAD FOR TRANSPORTATION OF MATERIAL UP TO SITE |
| 18 | DISMENTELING/REMOVING EARTHEN COFFER DAM AFTER COMPLETING CONSTRUCTION WORK OF CHECK DAM |
| 19 | FILLING OF DIVERSION CHENNEL (NOTE:-SIZE OF DIVERSION CHENNEL IS INCREASED DUE TO SOIL EROSEN DURING CONTINEUE FLOWING OF WATER FROM DIVERSION CHENNEL |
| 20 | PHOTOGRAPHY BEFORE STARTING THE WORK AT SITE ,TIME TO TIME DURING CONSTRUTION WORK AND AFTER COMLETION OF WORK |
| 21 | FIXING OF M.S. SIGN BOARD AT WORK SITE WITH PAINTING AND WRITING INFORMATION ABOUT CHECK DAM, |
| 22 | POST MANTIONED WORK LIKE INAUGARATION CEREMONY Please Enable Macros to View BoQ information |