| 1 | Single faced Cast Iron sluice gate rising spindle type manually operated generally confirming to S:13349:1992 , wall thimble mounted having cast iron frame(IS 210 Gr.FG 260) & door fitted with SS AISI 304 seating faces, complete with stainless steel extension spindle(SS AISI 410) distance between center of waterway to base of operating platform considered 4mtr., C.I guide brackets, SS coupling ,C.I Geared Headstock & indicator.A.Sluice Gates(CI)(Thickness of door is 22mm(minimum) and spindle dia 65mm(maximum)Size (W X H)mm 1300X2000 B.Sluice Gates(CI)Size (W X H)mm 1500X2000 C.Screen(SS)1500X2500 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)a with earth obtained from excavation of foundation. |
| 5 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). |
| 6 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge).(a) Depth up to 1.5 m. |
| 7 | (b) For additional depth beyond 1.5 m. and up to 3.00 m |
| 8 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
| 9 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 10 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codesa) Pakur Variety |
| 11 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety |
| 12 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 13 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild SteelII. SAIL/TATA/RINL |
| 14 | Brick work with 1st class bricks in cement mortar (1:4)(a) In foundation and plinth |
| 15 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:4 cement mortar(a) 20 mm thick plaster |
| 16 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 17 | Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D)(ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of sizeCover: 680 mm X 90 mmFrame: 800 mm X 165 mmopening: 500mmWeight: 196 kg (approx) |
| 18 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.(a) upto 150 mm. thick |
| 19 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge. |
| 20 | Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C |
| 21 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from box drain/ covered nikashi etc. by mathor labour after removing concrete slab / manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools & plantsincluding expulsion of impure / inflammable / asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of Municipal Corporation / Municipality / Notified Area Authority / Industrial Township Authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side in all respects, complete as per direction of the Engineer- in-Charge. (Land for disposal to be arranged by the contractor). (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) For Day : Ref: SD (UD&MA), 2018, P-16 , It-1.16 |
| 22 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg). Ref: PWD (IRRIGATION), 2018, P-(C- 11) , It - 2.24 |
| 23 | Labour charges for filling empty cement gunny bag/ polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or aggregates(stone / brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. Ref: PWD (IRRIGATION), 2018, P- (C-12) , It - 2.27. |
| 24 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. Ref: PWD (IRRIGATION), 2018, P- (C-12) , It - 2.29 |
| 25 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. Ref: PWD (IRRIGATION), 2018, P- (C-12) , It - 2.32 |
| 26 | Supply of silver sand stacked at site. [Page- 4, 6 th Corrigenda& Addenda to PWD (WB), SOR: 2017 |
| 27 | Add GST @18% on SL No 1 to 26 |
| 28 | Cess @ 1% on SL No 1 to 26 Please Enable Macros to View BoQ information |