Name of Work:- Annual maintenance of road from Veluthode bridge to Veluthode dam site, shorter access road for the year 2026-27.
Sl. No.
Item Description
1
Clearing light jungle without uprooting of thick vegetation and small trees of girth up to 30 cm and removal of rubbish up to a distance of 150 m outside the periphery of the area cleared as per the direction of Engineer in charge.(2 times in a year)
2
Clearing the side drain and leading channel by removing silt and debris and depositing the same with in initial lead and lift as per the direction of Enginer in charge.(2 times in a year 1st before August and 2nd before February)
3
Removal of slipped earth from road way and deposting spoil with initial lead and lift as per the direction of Engineer in charge at site.
4
Clearing the cistern culvert by removing silt and small boulders and debries and depositing the spoil within initial lead and lift as per the direction of Engineer in charge.(2 times in a year 1st before August and 2nd before February)
5
Cutting and removing fallen trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material as per the direction of Engineer in charge Beyond 30cm girthup to and including 60cm girth
6
Cutting and removing fallen trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material as per the direction of Engineer in charge Beyond 60cm girthup to and including 120cm girth
7
Cutting and removing fallen trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material as per the direction of Engineer in charge Beyond 120cm girthup to and including 240cm girth
8
Trimming, dressing and sectioning of the road drains on slope and earth surface of 50 cm wide on either side of the road where ever necessary as per the direction of Engineer in charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.