|
| 1 | Dismentelling of CC Road & its satcking old Mat, Lab, T&P etc all complete. As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H. |
| 2 | Excavation of trenches manually or machenically in soil mixed moorum/shingle/kanker for pipe line with lift upto 1.5 mtr etc all complete As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H |
| 3 | Concrete in 20 guage Brick blallst L.sand & cement in foundation under floor in proper of 10:5:1 including supply Lab, Mat, T&P etc all complete As vibhagiy rate sanctioned in 2025-26 |
| 4 | Making necessary arranment for barricading with ballies horizontally & vertically with provision of red flag, including all materials, lab, etc all complete,. As vibhagiy rate sanctioned in 2025-26 (A) For sewer Line 250 mm dia (B) For M.H |
| 5 | 1st class brick work for construction of sluice valve chamber in 1:3 cement, sand mortor including supply of Lab, Mat, T&P etc all complete ( As per UPJN SOR 1 2025-26 (A) For M.H. |
| 6 | 12 mm thick plaster with 1:3 cement & L. sand mortor with supply of Lab, Mat T&P etc all complete As vibhagiy rate sanctioned in 2025-26 |
| 7 | Providing bier to retain sewage water etc all complete. As vibhagiy rate sanctioned in 2025-26 |
| 8 | RCC work in 1:1.5:3 cement stone cement ballast slab including supply of Lab, Mat, T&P etc all complete As vibhagiy rate sanctioned in 2025-26 |
| 9 | Mild steel iron work in slab As vibhagiy rate sanctioned in 2025-26 |
| 10 | Bailing out of water etc all complete. |
| 11 | Cast cement concrete work for sear fixing in 1:2:4 cement appd. Sand stone ballast with supply os materials lab T&P etc all complete ( As vibhagiy rate sanctioned in 2025-26 |
| 12 | S/L/J work for RCC pipe 250mm dia including supply of Lab, mat, etc all complete. ( As vibhagiy rate sanctioned in 2025-26 |
| 13 | Making sewer line interconnection with supply of all lab, mat, etc all complete, |
| 14 | Supply of RCC frame etc all complete |
| 15 | S/F of fixing of M.H. Seat cover RCC ( As per unit rate) |
| 16 | Disposal of surplus earth 10% of exacavated earth etc all complete( As per UPJN SOR 1 2023-24) |
| 17 | Unforseen work Please Enable Macros to View BoQ information |