| 1 | Cartage of following material from center store Meerut to JE Store including loading and unloading at both end:- |
| 2 | Cartage of line material through suitable vehicle (per Job) 11 KV XLPE Cable/LT PVC Cable, ACSR Conductor, 11 KV Pin Insulator, 11 KV Disc, Fittings, M.S Channel, M.S Angle, 11 KV X Amrs, 11 KV Fuse Set, TPMO, MS Earthing ROd, Stay Set, Stay Wire other misc. (Distance 0-5 KM) |
| 3 | Cartage of line material through suitable vehicle (per Job) 11 KV XLPE Cable/LT PVC Cable, ACSR Conductor, 11 KV Pin Insulator, 11 KV Disc, Fittings, M.S Channel, M.S Angle, 11 KV X Amrs, 11 KV Fuse Set, TPMO, MS Earthing ROd, Stay Set, Stay Wire other misc. (Distance 5-15 KM) |
| 4 | Cartage of line material through suitable vehicle (per Job) 11 KV XLPE Cable/LT PVC Cable, ACSR Conductor, 11 KV Pin Insulator, 11 KV Disc, Fittings, M.S Channel, M.S Angle, 11 KV X Amrs, 11 KV Fuse Set, TPMO, MS Earthing ROd, Stay Set, Stay Wire other misc. (Distance 15-25 KM) |
| 5 | Cartage of ST Pole 11 Mtr long |
| 6 | Cartage of PCC Pole 11 Mtr long |
| 7 | Cartage of PCC Pole 8.5 Mtr long |
| 8 | Cartage of 10 to 100 KVA transformers. |
| 9 | Cartage of 250 & 400 KVA T/F |
| 10 | Cartage of CT/PT Unit & CT Unit |
| 11 | Cartage of VCB |
| 12 | Cartage of Pilfer proof Metering cubical etc. |
| 13 | Cartage of following material from JE Store to Site of work including loading and unloading at both ends. |
| 14 | Cartage of line material 11 KV XLPE Cable/LT PVC Cable, ACSR Conductor, 11 KV Pin Insulator, 11 KV Disc, Fittings, M.S Channel, M.S Angle, 11 KV X Amrs, 11 KV Fuse Set, TPMO, MS Earthing ROd, Stay Set, Stay Wire other misc. items |
| 15 | Cartage of ST Pole 11 Mtr long |
| 16 | Cartage of PCC Pole 11 Mtr long |
| 17 | Cartage of PCC Pole 8.5 Mtr long |
| 18 | Cartage of 10 to 100 KVA transformers. |
| 19 | Cartage of 250 & 400 KVA T/F |
| 20 | Cartage of CT/PT Unit & CT Unit |
| 21 | Cartage of VCB |
| 22 | Cartage of Pilfer proof Metering cubical etc. |
| 23 | Erection of ST POLE 11 Mtr Long after digging of pits of proper sizes, back filling of soil and ramming etc. |
| 24 | Erection of PCC POLE 11 Mtr Long after digging of pits of proper sizes, back filling of soil and ramming etc. |
| 25 | Erection of PCC POLE 8.5 Mtr Long after digging of pits of proper sizes, back filling of soil and ramming etc. |
| 26 | Erection of Double pole on ST Pole 11 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of soil and back filling of soil with the help of crane and manual service |
| 27 | Shifting of existing Double pole |
| 28 | Erection of Double pole on PCC Pole 11 mtr long after digging a pit of size 1.20x0.60x1.6 mtr in all type of soil and back filling of soil with the help of crane and manual service |
| 29 | Fabrication and fixing of all 11 KV HT Line Accessories. |
| 30 | Fixing of stay rod after digging a pit of size 1.20 X 0.60 X 1.6 Mtr And nuzzelling at the both ends and filling the pit with excavated earth soil with proper ramming. |
| 31 | Making making plinth after digging of earth and construction of walls of 9 inch width in firsr class bricks works in ratio 1:6 in cement and C. Sand and making plaster in ratio 1:4 in cement and C sand and laying of platform etc.complete (as per respo mannual) |
| 32 | Dismantling of existing plinth and making of new plinth after digging of earth and construction of walls of 9 inch width in firsr class bricks works in ratio 1:6 in cement and C. Sand and making plaster in ratio 1:4 in cement and C sand and laying of platform etc.complete/on rail pole / gatter pole as per site requirement (as per respo mannual) |
| 33 | Providing & Fixing of wire mesh fencing of above s/s complete with MS angle of size 35x3 mm and wire mesh of size 75x25x10 mm etc. complete 250/400 KVA TF (as per respo mannual) |
| 34 | Water level earthing of Tranformer by GI pipe of 32 mm dia and connection by MS earth strip of size 25x3 mm with cutting, jointing and welding etc. |
| 35 | Chemical Earthing |
| 36 | Installation of metering cubical complete |
| 37 | Installation of VCB complete |
| 38 | Laying /Listing, mounting and porper sagging of ACSR Dog/rabbit/Other Conductor with binding etc. |
| 39 | Laying of 11 KV XLPE with binding etc.(over head) |
| 40 | Laying of 11 KV AB Cable with binding etc.(over head) |
| 41 | Laying of LT AB Cable with binding etc.(over head) |
| 42 | Making a Trench and Laying 11 XLPE (3x300) sqmm in HDPE pipe (Under Ground) Including Providing and Fixing of Bricks and Fine River Sand filled in cable Trench. HDPE Pipe Provide by the Contractor. |
| 43 | Making a Trench and Laying (double ckt) 11 KV XLPE cable (under Ground) in HDPE pipe including providing and fixing of Bricks and Fine River Sand filled in cable trench. Both sides and upper part should be covered with red stone/concrete/plaster slab to protect any accidental incident ( HDPE Pipe Provide by the Contractor). [As per RESPO Manual] |
| 44 | Making a Trench and Laying (single ckt) 11 KV XLPE cable (under Ground) in HDPE pipe including providing and fixing of Bricks and Fine River Sand filled in cable trench. Both sides and upper part should be covered with red stone/concrete/plaster slab to protect any accidental incident ( HDPE Pipe Provide by the Contractor). [As per RESPO Manual] |
| 45 | Laying (Double Ckt.)11 KV XLPE cable under ground By Sand & Brick Method |
| 46 | Laying (Single Ckt.) 11 KV XLPE cable under ground in By Sand & Brick Method |
| 47 | Laying (Double Ckt.) 11 KV XLPE cable in Road Crossing/ Nala Crossing With 6\\" dia G.I. pipe |
| 48 | Laying (Single Ckt.) 11 KV XLPE cable in Road Crossing/ Nala Crossing With 6\\" dia G.I. pipe |
| 49 | Hosting of cable at Double Pole/ Four Pole etc. |
| 50 | Tree Cutting on Road Side |
| 51 | Road Restoration (Concrete/Dambar/Kachcha/Pakka/highway etc) |
| 52 | Providing & Filling of indoor/outdoor jointing Kit. (if not available in central store.) |
| 53 | Filling of indoor/ outdoor Jointing kit |
| 54 | Providing and Fixing of Cable Route Marker. |
| 55 | Grouting of Pole |
| 56 | Providing and Fixing of G.I. Pipe 6\\" dia and Length of 3 Mtr. |
| 57 | Gaurding of 11 KV Line spans complete |
| 58 | Fabrication, Mounting, Fixing of MS channels/angle on the double Poles for 11 KV accessories, |
| 59 | Providing & Fixing of Distribution Boxes |
| 60 | Fixing of Distribution Boxes |
| 61 | Providing and Fixing of Fuse Set on D/P |
| 62 | Fixing of Fuse Set on D/P |
| 63 | Providing & Fixing of TPMO on D/P |
| 64 | Fixing of TPMO on D/P |
| 65 | Providing & Fixing of Single Circuit tailless unit with frame and required accessories. |
| 66 | Providing & Fixing of Double Circuit tailless unit |
| 67 | Providing & Fixing of MS Frame for Tailless unit made of MS Angle of Size 50x50 mm with ms bolts/nuts etc. |
| 68 | Providing & Fixing of required accessories for fixing Double Circuit Tailless unit |
| 69 | Grouting of Frame in the plinth etc. |
| 70 | Installation of 10 to 100 KVA Transformer on the D/P Structure |
| 71 | Installation of 250 to 400 KV Transoformer on the plinth/ D/P Sturcture |
| 72 | Earthing of Poles by MS Earth electrods |
| 73 | Providing & Fixing of MS Holding Clamp/LTClams/Dead end Clams/J-Hook clams/stay clamp/other. |
| 74 | Providing & Fixing of Piercing clamps off sizes. |
| 75 | Providing & Fixing of MS Bolts/Nuts of sizes. |
| 76 | Providing & Fixing of AL Crimping Lugs of size 70/120/240/400 sqmm |
| 77 | Making Section of HT Lines/LT Lines |
| 78 | Grouting of poles. |
| 79 | Dismantling and cartage of ST Pole/STP/PCC Pole |
| 80 | Dismantling and cartage of CT/PT units |
| 81 | Dismantling and cartage of ACSR Dog/other conductor |
| 82 | Dismantling of LT AB Conductor/other conductor |
| 83 | Dismantling and cartage of 10 to 100 KVA Transformer |
| 84 | Dismantling and cartage of 250,400,630 KVA Transformer |
| 85 | Dismantiling of 11 KV XLPE/LT XLPE/AB Cable etc. Please Enable Macros to View BoQ information |