| 1 | Construcition, Supply, Installation, Testing and Commissioning of 3.00 M.L.D STP based on Constructed Wetland Technology including Process & Site Layout Plan and Site Grading Plan, Hydraulic Diagram, Single Line Diagram, Basic Electrical Drawing, Civil General Arrangement Drawings, Structural Design and Drawings and Construcion Drawings, Electrical and plumbing Drawings Operation and Maintenance Manuals etc, consisting of Primary Treatment Unit, Treated Effluent Disposal drain/Channel, Interconnecting Piping with required Gates, Pump House, Bio-Media, Effluent teated water pipeline and Plantation/Landscaping work, Boundary wall pump room and other Miscellaneous Works such as sewer line connecting to collection Tank and 40 K.W. Solar Plant complete and i/c works for required of STP complete all associated Civil, Electrical, Plumbing Works and Commissioning/Installation work and also i/c Operation and Maintenance 05 Years of 3.00 MLD Sewage Treatment Plant based on Constracted Wetland Technology as a whole i/c Supply of Chemical and Consumables Wetland Technology as a whole i/c supply of Chemical and consumables materials, Disposal of Plant Residuals (e.g. Screenings, Grit and Dewatered Sludge), Manpower required, General Maintenance of Civil Structures, Preventive and Breakdown Maintenance of Electrical Items, Fields Instruments etc., Cost of Collection, Analysis, Reporting, Monitoring and Maintaining Record of Samples from the Raw Sewage and Treated Sewage daily collected at least for one time a day from the Entry and Exit of the STP Units thereon (excluding power) as mentioned in the Tender, Complete work of STP as per direction of E/I. (Excluding G.S.T.) Please Enable Macros to View BoQ information |