| 1 | Laoding Carriage and unloading of PCC/ST pole from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 2 | Carriage all type loose line material from ESC store Unnao/Sub station store/other site to site work as per required and vice versa. |
| 3 | Dismantling of old damaged pole/double pole and X-arms, brackets, insulators channels and all hardware fitting. |
| 4 | Erection of new PCC/ST pole for fitting of X-Arms, brackets insulators and other hardware fittings. |
| 5 | Erection of Double Pole structure including digging of pit and fitting of all accessories complete. |
| 6 | Placement of 10/16 KVA T/F & 25/63/100 KVA Transformer on Existing damage single /Double pole and Re-Installation and commissioning old T/F on new single/double pole in same place including dressing damaged cable, lugs, jumping & connecting Earthing of body & neutral as per required. |
| 7 | Dismantling re-usable old pole from siteto site and their erection & fitting X-arm, bracketsInsulators another hardware fitting etc. |
| 8 | Dismantling /Laying/Repairing of repairing of aerial bunched cable from L.T.O.H. line ( To be replace/damaged) |
| 9 | Digging of cable trench approx. 1200x1200 mm by JCB/kachha road/Pakka Road for suitable size for damaged cable joints/new cable lying |
| 10 | Opening and reconnection of consumer connections for shifting of replacement of pole. |
| 11 | Re-sagging of conductor, on old line after erection/repair of pole, binding of conductor etc. |
| 12 | Opening of H.T./L.T. jumpers/Re-jumpering from the existing H.T.O.H./L.T.O.H. line erection work. |
| 13 | Supply and fixing holding clamps for PCC/STP with nuts & Bolts |
| 14 | Supply and fixing Stay clamps for PCC/STP with nuts & Bolts |
| 15 | Supply and fixing F clamps for PCC/STP with nuts & Bolts |
| 16 | Excavation of foundation and taken out the damaged pole/pole to be shifted from the ground. Repairing of rotted bottom of STP by welding MS sheet/3 nos., MS angles of size 45x45x6 mm 750 mm long as per site condition |
| 17 | Grouting of pole with cement brick ballast and coarse sand as per standard specifications. |
| 18 | Fabrication/Modification of MS items /nuts & bolt as per requirement of site condition. |
| 19 | Fixing of stay rod and its erection and grouting by fitting of stay clamp, stay wire and its proper binding and tighting etc. |
| 20 | Repositioning of tilted PCC/ST Pole |
| 21 | Chopping of tree branches lying in te route of existing line touching the tree branches to the phase line conductor as per requirements of site. Please Enable Macros to View BoQ information |