| 1 | Excavation in foundation in ordinary soil including lift upto 1.50 M and lead upto 30M. Including watering ramming and dressing etc. and disposal of surplus earth as upto a distance of 30 M. from the foundation trenches.etc. required for proper completion of the work. SI.No.251. |
| 2 | Concrete with 4 cm gauge brick ballast Coarse sand of2.25 F.M and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T & P etc. required for proper completion of the work. S.I.No.275 |
| 3 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 inR.C.C foundation S.I.No. 287 |
| 4 | M- 150 brick work in 1:4 cement & C sand in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 305(b) |
| 5 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 inR.C.C Tie beam S.I.No. 283 |
| 6 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 inR.C.C Pillars S.I.No. 288 |
| 7 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 inR.C.C Lighter beam S.I.No. 285 |
| 8 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:1.5:3 inR.C.C Heavy beam S.I.No. 286b |
| 9 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:1.5:3 inR.C.C Slab S.I. No. 284b |
| 10 | Mild steel iron in plain work such as in reinforced concrete or rein force brick work wrought to required shape as necessary cutting. bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured required to proper completion of the work S.I.No. 504 |
| 11 | M- 150 brick work in 1:4 cement & C sand in super structure including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 305(b), 309 & 310 |
| 12 | 12 mm thick plaster on rough face of wall with cement mortar consising of 1 part cement and 4 part of approved coarse sand. Minimum thickness not to be less then 10 mm including supply of all materials, labour and T & P etc. required for completion of work. as per S.I.No. 584 - 596 . |
| 13 | Same as item No. 12 above but in Plain surface S.I.No.584 |
| 14 | Earth work in embankment in ordinary soil cutting and and cartage from 5.00 km distance inculding ramming Dressing and Levelling for widening of Road for completion work as per S.I. No. 253 |
| 15 | One priming coat of cement primer and one coat dry distemper on new work including supply of all materials, labour and T & P etc. as per S.I.No. 649 & 650 |
| 16 | Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials labour and T & P etc. as per S.I.No. 660 & 661 |
| 17 | S/F of Signboard and photography Please Enable Macros to View BoQ information |