|
| 1 | Excavation For Foundation In Earth, Soil Of All Types, Sand, Graval And SoftMurum, Including Removing The Excavated Material Up To A Distance Of 50M.Beyond The Building Area & Stacking And Spreding As Directed, Dewatering, Preparing The Bed For The Foundation And Necessary Back Filling, Remming, Watering Including Shoring And Strutting Etc. Complete. ( Lift Up To 1.5 M. ) |
| 2 | Excavation For Foundation In Hard Murum Including Removing The Excavated Materials Upto Distance Of 50 Metres Beyond The Building Area And StackingAnd Spreading As Directed, Dewatering, Preparing The Bed For The FoundationAnd Necessary Back Filling, Ramming, Watering Including Shoring And Strutting Etc. Complete. (Lift Upto 1.50 M)By Manual Means |
| 3 | Excavation For Foundation / Pipe Trenches In Soft Rock And Old Cement And Lime Masonry Foundation Asphalt Road Including Removing The Excavated Material Upto A Distance Of 50 M Beyond The Area And Lifts As Below, Stacking As Directed By Engineer-In-Charge, Normal Dewatering, Preparing The Bed For Foundation And Excluding Backfilling, Etc. Complete. (Bd-A-4/259) |
| 4 | Filling In Plinth And Floors Murum Bedding In Trenches With Approved Murum From Excavated Materials From Foundation In 15Cm To 20Cm Layers Including Watering And Compaction, Etc, Complete.(Bd-A-10/263) |
| 5 | Providing And Laying In Situ, M-15 Of Trap/Granite/ Quartzite/ Gneiss Metal For Foundation And Bedding Including Bailing Out Water, Formwork, Compacting And Curing . Comp. |
| 6 | Class NP ii ( for 2.0 m lenth) 200 mm Dia |
| 7 | Class NP ii ( for 2.0 m lenth) 300 mm Dia |
| 8 | Class NP ii ( for 2.5 m lenth) 450 mm Dia |
| 9 | Class NP ii ( for 2.0 m lenth) 200 mm Dia |
| 10 | Class NP ii ( for 2.0 m lenth) 300 mm Dia |
| 11 | Class NP ii ( for 2.5 m lenth) 450 mm |
| 12 | Circuler Chamber -14671.73No366793.13MJP SSR 2023-24 P No- 286, Sr no / 1381 |
| 13 | House Chember - RA..1441.00No7205.00PWD SSR 2022-23 P No- 275, Sr no / 1383 |
| 14 | Item No.11 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation,surcharging etc.complete.MJP SSR 2023-24 Pno 45 I.no 15273.64Cum84.00Cum22985.72MJP SSR 2023-24 P.No 40, E/15 |
| 15 | Item No.12 Providing And Fixing Pvc Pipe Etc Comp 90 Mm |
| 16 | Item No.13 Lowering Laying And Jointing Pvc Pipe Etc Com 90 Mm50.00RmtMJP SSR 2023-24 Pno 80 / I -135.00Rmt1750.00 |
| 17 | Item No.14 Providing And Fixing Ms Grill Work1.00SqmPWD SSR 2022-23 Pno.192/12901507Sqm1507.00 |
| 18 | Item No.15 Providing And Fixing 10 Cm Pvc Nahani Trap With Grating Etc. Complete.15NoPWD SSR 2022-23 Pno.351/1436539no8085.00 |
| 19 | Item No.16 Providing And Fixing Name Board Etc Comp1NoMR1000no1000.00SayRs931748.35 |
| 20 | Add gst 18% Please Enable Macros to View BoQ information |