Railways Government Departments Closing in 2 days TDR #55996937

Supply Of Rotary screw electrical driven Air Compressor 500 CFM

Issued by Government Departments · , Jharkhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Jul 2026
2 days left
EMD
2.26 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of rotary screw electrical driven air compressor 500 cfm , the cost of basic machine. [ warranty period: 24 months after the date of delivery ] ] , cost of the concomitant accessories according to tender specifications. [ warranty period: 24 months after the date of delivery ] ] , cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional. [ warranty period: 24 months after the date of delivery ] ] , cost of turnkey charges viz. foundation, installation & commissioning etc ] , cost of preventive maintenance during 1st & 2nd year of warranty period. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 note: 1. the power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consu ming equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operati ng pressure. for the purpose of comparison, a flat rate of electricity shall be taken @ rs. 5 per unit (kw h our) consumption. 2. formula for calculating power consumption cost will be power consumption cost in r s = total input power of compressor including ancillary power consuming equipments of the machine at fu ll rated capacity in kw* 4400 hr * 5 . ] , optional accessories with break up of individual items as specified in clause 4.3 of section iv . [ warranty period: 24 months after the date of delivery ] ] , spares with break up of individual items as per clause 5 and clause 13 of section v . [ warr anty period: 24 months after the date of delivery ] ] , cost of comprehensive amc for five years after the warranty as per clause 17 ] , consumables as per clause 6 of section v with break up of individual items as applicable. [ warranty period: 24 months after the date of delivery ] ] , the cost of basic machine. [ warranty period: 30 months after the date of delivery ] ] , cost of the concomitant accessories according to tender specifications. [ warranty period: 24 months after the date of delivery ] ] , cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional [ warranty period: 24 months after the date of delivery ] ] , cost of turnkey charges viz. foundation, installation & commissioning etc ] , cost of preventive maintenance during 1st & 2nd year of warranty period. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 note: 1. the power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consum ing equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operating pressure. for the purpose of comparison, a flat rate of electricity shall be taken @ rs. 5 per unit (kw hour) consumption. 2. formula for calculating power consumption cost will be power consumption cost in rs = t otal input power of compressor including ancillary power consuming equipments of the machine at full rat ed capacity in kw* 4400 hr * 5 ] , optional accessories with break up of individual items as specified in clause 4.3 of section iv . [ warranty period: 24 months after the date of delivery ] ] , spares with break up of individual items as per clause 5 and clause 13 of section v . [ warr anty period: 24 months after the date of delivery ] ] , cost of comprehensive amc for five years after the warranty as per clause 17 ] , consumables as per clause 6 of section v with break up of individual items as applicable. [ warranty period: 24 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1The Cost of Basic machine. [ Warranty Period: 24 Months after the date of delivery ] ]
2Cost of the concomitant accessories according to tender specifications. [ Warranty Period: 24 Months after the date of delivery ] ]
3Cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional. [ Warranty Period: 24 Months after the date of delivery ] ]
4Cost of Turnkey Charges viz. foundation, installation & commissioning etc ]
5Cost of Preventive Maintenance during 1st & 2nd year of Warranty Period. ]
6The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 Note: 1. The power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consu ming equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operati ng pressure. For the purpose of comparison, a flat rate of electricity shall be taken @ Rs. 5 per unit (KW H our) consumption. 2. Formula for calculating power consumption cost will be Power consumption cost in R s = Total Input power of compressor including ancillary power consuming equipments of the machine at fu ll rated capacity in KW* 4400 hr * 5 . ]
7Optional Accessories with break up of individual items as specified in clause 4.3 of section IV . [ Warranty Period: 24 Months after the date of delivery ] ]
8Spares with break up of individual items as per clause 5 and clause 13 of section V . [ Warr anty Period: 24 Months after the date of delivery ] ]
9Cost of comprehensive AMC for five years after the warranty as per clause 17 ]
10Consumables as per clause 6 of section V with break up of individual items as applicable. [ Warranty Period: 24 Months after the date of delivery ] ]
11The Cost of Basic machine. [ Warranty Period: 30 Months after the date of delivery ] ]
12Cost of the concomitant accessories according to tender specifications. [ Warranty Period: 24 Months after the date of delivery ] ]
13Cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional [ Warranty Period: 24 Months after the date of delivery ] ]
14Cost of Turnkey Charges viz. foundation, installation & commissioning etc ]
15Cost of Preventive Maintenance during 1st & 2nd year of Warranty Period. ]
16The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 Note: 1. The power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consum ing equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operating pressure. For the purpose of comparison, a flat rate of electricity shall be taken @ Rs. 5 per unit (KW Hour) consumption. 2. Formula for calculating power consumption cost will be Power consumption cost in Rs = T otal Input power of compressor including ancillary power consuming equipments of the machine at full rat ed capacity in KW* 4400 hr * 5 ]
17Optional Accessories with break up of individual items as specified in clause 4.3 of section IV . [ Warranty Period: 24 Months after the date of delivery ] ]
18Spares with break up of individual items as per clause 5 and clause 13 of section V . [ Warr anty Period: 24 Months after the date of delivery ] ]
19Cost of comprehensive AMC for five years after the warranty as per clause 17 ]
20Consumables as per clause 6 of section V with break up of individual items as applicable. [ Warranty Period: 24 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 55996937
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 07-07-2026
Authority
Authority Name South Eastern Railways
Work Description Supply Of rotary screw electrical driven air compressor 500 cfm , the cost of basic machine. [ warranty period: 24 months after the date of delivery ] ] , cost of the concomitant accessories according to tender specifications. [ warranty period: 24 months after the date of delivery ] ] , cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional. [ warranty period: 24 months after the date of delivery ] ] , cost of turnkey charges viz. foundation, installation & commissioning etc ] , cost of preventive maintenance during 1st & 2nd year of warranty period. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 note: 1. the power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consu ming equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operati ng pressure. for the purpose of comparison, a flat rate of electricity shall be taken @ rs. 5 per unit (kw h our) consumption. 2. formula for calculating power consumption cost will be power consumption cost in r s = total input power of compressor including ancillary power consuming equipments of the machine at fu ll rated capacity in kw* 4400 hr * 5 . ] , optional accessories with break up of individual items as specified in clause 4.3 of section iv . [ warranty period: 24 months after the date of delivery ] ] , spares with break up of individual items as per clause 5 and clause 13 of section v . [ warr anty period: 24 months after the date of delivery ] ] , cost of comprehensive amc for five years after the warranty as per clause 17 ] , consumables as per clause 6 of section v with break up of individual items as applicable. [ warranty period: 24 months after the date of delivery ] ] , the cost of basic machine. [ warranty period: 30 months after the date of delivery ] ] , cost of the concomitant accessories according to tender specifications. [ warranty period: 24 months after the date of delivery ] ] , cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional [ warranty period: 24 months after the date of delivery ] ] , cost of turnkey charges viz. foundation, installation & commissioning etc ] , cost of preventive maintenance during 1st & 2nd year of warranty period. ] , the power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 note: 1. the power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consum ing equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operating pressure. for the purpose of comparison, a flat rate of electricity shall be taken @ rs. 5 per unit (kw hour) consumption. 2. formula for calculating power consumption cost will be power consumption cost in rs = t otal input power of compressor including ancillary power consuming equipments of the machine at full rat ed capacity in kw* 4400 hr * 5 ] , optional accessories with break up of individual items as specified in clause 4.3 of section iv . [ warranty period: 24 months after the date of delivery ] ] , spares with break up of individual items as per clause 5 and clause 13 of section v . [ warr anty period: 24 months after the date of delivery ] ] , cost of comprehensive amc for five years after the warranty as per clause 17 ] , consumables as per clause 6 of section v with break up of individual items as applicable. [ warranty period: 24 months after the date of delivery ] ]
Basic Detail
Tender No 65245061C
Bidding Type Tender
Location
City
State Jharkhand
Key Dates
Publish Date 10 Jun 2026
Submission Date 07 Jul 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 2.26 Lakhs
Exemption Not Available
Document List
3d57c01c-71b6-414b-9620-ec67700e8a98.pdf
5166192.pdf
5670227.pdf
5794980.pdf
5794982.pdf
5794984.pdf
5794985.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
pdf

3d57c01c-71b6-414b-9620-ec67700e8a98.pdf

pdf

5166192.pdf

pdf

5670227.pdf

pdf

5794980.pdf

pdf

5794982.pdf

pdf

5794984.pdf

pdf

5794985.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders