| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth ( using mechanical method) including necessary repairs to scratches etc,all complete as per instruction of Engineer in charge. |
| 2 | Providing and Applying of Dr. Fixit Dampguard is a two-component coating composed of epoxy resin, curing agent, inert pigments & properly selected fine fillers, additives in water as a medium. It has an advantage of dilution with water for application over cementitious surfaces. It is used as internal coating for the damp-proofing treatments of water tanks. It has excellent water resistance, adhesion, hardness & toughness and sets faster similar to solvent based epoxy formulations.Scrapping should be done upto existing plastering surface. Clean the dust by washing it with water,Fill the cracks & grooves with Dr. Fixit Dampguard and cement modified putty & allow it to dry for at least 24 hours.Apply the first brush coat of mixed quantity (1:1:1 - base :hardener : water) of Dr. Fixit Dampguard. Allow drying for 6 to 8 hrs. Apply second and third brush coat of mixed Dr. Fixit Dampguard. Allow it to cure completely for 24 hours etc,all complete as per instruction of Engineer in charge. |
| 3 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth etc,all complete as per instruction of Engineer in charge. Make:Asian,Birla white,JK. |
| 4 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound ) content etc,all complete as per instruction of Engineer in charge. Note: Base coat of Royale luxury emulsion.Make:Asian,Berger. |
| 5 | Wall painting with Acrylic emulsion paint of approved brand and manufacture to give an even shade :Two or more coats etc,all complete as per instruction of Engineer in charge.Note:Royale Luxury emulsion or equivalent and Colour and shade will be approved by Engineer In-Charge.Make:Asian,Berger. |
| 6 | Finishing walls with water proofing cement paint of required shade : Old work (one or more coats applied @ 2.20 kg/10 sqm)over priming coat of primer applied @ 0.80 litrs/10 sqmcomplete including cost of Priming coat.Make:Asian,Berger.Location : NDBP Bay -1&2,BTF Bay area. |
| 7 | Painting with Synthetic enamel paint of approved brand andmanufacture to give an even shade :Two or more coats on new work. Make:Asian,Berger. |
| 8 | Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqmover and including one coat of priming for exterior primer applied@ 2.20 kg/10 sqm).Make:Asian,Berger.Location : NDBP,BTF Building outer Border. |
| 9 | Polishing on wood work of French spirit polishing : Two or more coats on new works including a coat of wood filler etc all complete as per instruction of Engineer in charge.Before quoting the rate contractor should visit the site. |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand).Location : NDBP Bay - 1,2 |
| 11 | 15mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement:6 fine sand).Location : NDBP Bay - 1,2 |
| 12 | Dismantling frame ,doors, windows and clerestory windows (steel or wood)shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead. |
| 13 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length hold fast lugs or dash fastener.Second class teak wood.Location : NDBP Terrace door. |
| 14 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, 6' SS hinges(3nos per door),handle,tower bolts and SS aldrop lock etc all complete as per direction of Engineer-in-charge.Second class teak wood.35 mm thick shutters.Location: NDBP Terrace door. |
| 15 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources). |
| 16 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 17 | Centering and shuttering including strutting, propping etc. and removalof form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.Location: NDBP terrace. |
| 18 | Providing and fixing Ist quality ceramic glazed wall tiles conforming toIS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black ofany size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm , including pointing in white cement mixed with pigment of matching shade complete.Location : BTF Entrance. |
| 19 | Providing and fixing of Toilet Mirror of superior glass 6mm thick (of approved quality) using of 12 mm thick BWR plywood on back side with all around teak wood beading fixed to wooden polish with c.p brass screws and washers all complete as per instruction of Eingineer in charge.Make: Plywood : Green ply,Sharon,Archid, Kitply & Mirror : Saint cobain.Location : NDBP Building / Toilets . |
| 20 | Providing and fixing of Vision glass for existing available wooden / false door the rate should be inclusive of 5mm thick clear glass, door removing,refixing, glass around necessary wooden beading, to provided inside door glass open closed ply wood shutter and entire door and frame inside ,outside paint with 2coats of synthetic enamel paint etc all completed as per instruction of Engineer in charge.Glass size : 0.20m x 0.15m - 1no.Location : NDBP Building / Gents Toilets . |
| 21 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Location BTF Terrace. |
| 22 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (± 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.Make : JSW,TATA,Jindal,HT steel,CR steel.Location BTF Terrace. |
| 23 | Chipping the old chips plastering or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 500 metres lead as per direction of Engineerin-Charge.Location : NDBP terrace. |
| 24 | 20 mm thick plaster with 1:4 cement motoar ratio to add Dr.FIXIT URP (Liquid for 500ml for 50 kg cement bag ) after completed wall plastering work one day curing if any should be rectified as directed by Enginner in charge.Approved Make:.Water proofing material : Dr fix it.Location : NDBP terrace. |
| 25 | Demolishing lime concrete manually/ by mechanical means and disposal of material within 500 metres lead as per direction of Engineerin-Charge.Location : NDBP terrace. |
| 26 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 6-12.5mm nominal size derived from natural sources) .Location : NDBP terrace. |
| 27 | OUTER WALL RAIN COAT SELECT:Providing & Applying First of Basecoat on Raincoat WPC as Second and third coat of Dr. Fixit Raincoat Select – single component UV stable Top coat in approved shade for exterior coating comprised of high quality acrylic emulsion polymer, l,ight fast & weather durable pigments, properly selected & graded fine fillers, additives & biocides. The material shall be applied un-diluted in right angle to Universal Basecoat layer and DFT of 190 microns, as per manufacturers recommendation, etc, complete. The product shall have Elongation > 100% as per ASTM D 412, Tensile strength : 2.5 Mpa as per ASTM D 412, Water Resistance conforming to SS 500, Crack bridging ability conforming to Class A4 as per EN 1062 Part 7, Positive hydrostatic pressure > 7 bar as per DIN 1048, Anti-carbonation property complying EN 1062 Part 6, RCPT conforming to ASTM C 1202. Note: The colour shall be approved by the Engineer-in-charge Warranty of 2years should be provided by contracter for water proofing work as prescribed performa by Niot.Location : NDBP server room outer wall.Note : Scaffolding for outer wall water proofing which will be paide seperatly. |
| 28 | Providing and applying of Dr. Fixit pidifin 2k on cement concrete slab with surface of application must be throughly prepared by mechnical/manually means, to remove all loose particles, oil and grease etc. The surface of application must be pre wetted throughtly with water & brought to a touch dry state. Take up the first coat application with nylon brush and keep 6 to 8hrs gap after completion of first coat, second coat application should in direction perpendicular to the first and leave to air cure 3-5 days etc complete as drected by engineer in charge. Note: Ponding of water of 100mm depth for peroid of 48hours to ensure the leak proof.Location : NDBP terrace |
| 29 | Laying upto 100mm thick compacted bed of brick coba of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with sand, including finishing smooth etc. complete as per direction of Engineer-in-charge.(Note : Brick Aggregate provided by NIOT).Location : NDBP terrace |
| 30 | Providing and laying pressed clay tiles (as per approved pattern 20mm nominal thickness and of approved size) on roofs jointed with cement mortar 1:4(1 cement :4 coarse sand) mixed with 2% integral water proofing compound laid over a bed of 20 mm thick cement mortar 1:4 (1 cement:4 coarse sand) and finished neat complete.Location : NDBP terrace |
| 31 | Erecting/Dismantling double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding,scaffolding top to providing plywood platform,steel platform and necessary steps arrangements,necessary safety arrangements for platfrom top. Note :The Contractor must arrange for all necessary safety equipment including safety shoes, helmets, harnesses, jackets, safety rope with proper arrangement, all complete as per instruction of Engineer in Charge. Rate inclusive of Providing Scaffolding material and necessary Transportation.Location : NDBP server room outer wall. |
| 32 | Providing and laying RCC Pedestal (1:2:4) of Size 20\\" (L) X 10\\" (W) *10\\" (H) Rate inclusive of necessary reinforcement & Shuttering etc all complete as per direction of Engineer in charge.Location : NDBP terrace parapet wall |
| 33 | Providing and applying twocoats of BULWARKCTP ULTRA is single component watar based high solid Polyurethane based Coal Tar Coating complete as instructed by manufacture specification Methodology of application of Surface shall be cleaned thoroughly with wire brush and light chisels for making the surface free, when entire surface is clean,dry and moisture free, applied 1stcoat over the surface Horizontal direction (Dilutewith20%water) and Topcoat applied over the surface Vertial direction ( Dilute 5-10°AWater) the time gap in between1st and topcoat Minium 3to4 hours.Location : NDBP terrace parapet wall |
| 34 | Providing and fixing 12mm thick Glass Display rack for keeping the Mementos with S.S.'F' bracket ever 500mm interval and necessary handware fittings for .The glass should be I polish.The rate inclusive of materials , loading , unloading,labour charges and transportation etc,all complete as per direction of Engineer in charge.Note:Glass wide 0.30m, model available in NIOT campus.Before quoting the rate contractor must inpect the site condition.Glass rack size : Mr.K. Thirumurugan Cabin : 1.40m x 2 nos , 2.50m x 1no. Mr. B. Kesava Kumar cabin.1.80m x2nos. Location: NDBP Building /1st floor. |
| 35 | Fixing the holes in wall of size 150-300mm With Chipping the sides and making good with necessary plastering in circumference etc ., all complete as directed by engineer in charge.Location : NDBP terrace |
| 36 | Repairing the existing damaged Gypsum false ceiling by providing and fixing new Gypsum board false ceiling consisting of frame work made with 50mm square M.S tubes of 18 mm thickness as main runner at 600mm clear bothways, suspended/ supported with M.S. flats,(False celing size 1sqm Approx) 25x4 mm from existing R.C.C. slab including providing and fixing expanded metal of size 5.25mmx1.25mm thickness welded to main runners and applying POP (calcium sulphate semi hydrate variety) to the expanded metal of thickness not less than 10 mm finished smooth to line and level including necessary supports scaffolding etc. as required and also including applying a coat of red oxide zinc chromate primer over the M.S. frame work and suspenders complete.Gypsum board tie up with wire in the existing wall, bottom of the gypsum board provide the necessary angel in all surrounding the existing the wall cost is included 12.50 mm thick and the rate including one coat putty,one coat primer,two coat of emulsion paint etc.all complete as per instruction of Engineer in charge.Location : NDBP entrance |
| 37 | Wall painting with Premium acrylic emulsion paint of approved brand and manufacture to give an even shade : Two or more coats on old work for painting &Rate inclusive of Scrapping, Touchup Putty(Birla White) & one coat primer etc.all complete as per instruction of Engineer in charge.Make : Asian ,Nerolac, Berger (Primer & Paint).Location : NDBP Pantry |
| 38 | TOTAL WITHOUT GST |
| 39 | GST 18% |
| 40 | TOTAL Please Enable Macros to View BoQ information |