Boiler No 1 or 2 Capacity 20 Ton per hrs Cleaning of the roof walls
Boiler No 1 or 2 Capacity 20 Ton per hrs Cleaning of the roof walls and surrounding areas by sweeping removing garbage and disposing of it at the designated location
2
Boiler No 1 or 2 Capacity 20 Ton per hrs Cleaning of furnace chambers ducting etc cleaning the chimney base cleaning
Boiler No 1 or 2 Capacity 20 Ton per hrs Cleaning of furnace chambers ducting etc cleaning the chimney base cleaning the interiors of the wet scrubbers installed on both boilers removing ash and disposing of it at the designated location
3
Boiler No 1 or 2 Capacity 20 Ton per hrs External cleaning of all tubes superheater coils air heaters and economizer coils
Boiler No 1 or 2 Capacity 20 Ton per hrs External cleaning of all tubes superheater coils air heaters and economizer coils using coconut rope emery paper and iron strips and scrapers to ensure the tubes are completely free of ash removing the collected ash and disposing ID or FD underground ducting cleaning of it at the designated location
4
Boiler No 1 or 2 Capacity 20 Ton per hrs Satisfactory internal cleaning of all tubes and air heaters
Boiler No 1 or 2 Capacity 20 Ton per hrs Satisfactory internal cleaning of all tubes and air heaters using cutters and brushes ensuring that no cutter or brush gets stuck inside any tube and that no scale remains in any tube
5
Boiler No 3 Capacity 30 Ton per hrs Cleaning of the roof walls
Boiler No 3 Capacity 30 Ton per hrs Cleaning of the roof walls and surrounding areas by sweeping removing garbage and disposing of it at the designated location
6
Boiler No 3 Capacity 30 Ton per hrs Removing accumulated ash and debris from every gallery inside the boiler and disposing
Boiler No 3 Capacity 30 Ton per hrs Removing accumulated ash and debris from every gallery inside the boiler and disposing of it at the designated location
7
Boiler No 3 Capacity 30 Ton per hrs Removing ash from the installed wet scrubber and chimney
Boiler No 3 Capacity 30 Ton per hrs Removing ash from the installed wet scrubber and chimney and disposing of it at the designated location
8
Boiler No 3 Capacity 30 Ton per hrs External cleaning of the air heater economizer coils and their ducts
Boiler No 3 Capacity 30 Ton per hrs External cleaning of the air heater economizer coils and their ducts removing ash and disposing of it at the designated location
9
Boiler No 3 Capacity 30 Ton per hrs Internal cleaning of the installed air heater drum to drum tubes
Boiler No 3 Capacity 30 Ton per hrs Internal cleaning of the installed air heater drum to drum tubes using brushes ensuring that no brush gets stuck inside any tube
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.