| 1 | L.T. Cable lying at air ( a) 1.5 mm2 to 6 mm2 |
| 2 | (b) 10 mm2 to 35 mm2 |
| 3 | (c ) 50 mm2 to 95 mm2 |
| 4 | (d ) 120 mm2 to 240 mm2 |
| 5 | (e) 300 mm2 to 400 mm2 |
| 6 | H.T Cable lying at air ( a) 150 mm2 to 250 mm2 |
| 7 | (b) 250 mm2 to 300 mm2 |
| 8 | L.T cable lying at underground existing/newTrenches complete with all necessary Connection, including digging & filling (a) 1.5 mm2 to 6 mm2 |
| 9 | (b) 10 mm2 to 35 mm2 |
| 10 | (c ) 50 mm2 to 95 mm2 |
| 11 | (d ) 120 mm2 to 240 mm2 |
| 12 | (e) 300 mm2 to 400 mm2 |
| 13 | Lug crimping LT (a) 1.5 mm2 to 6 mm2 |
| 14 | (b) 10 mm2 to 35 mm2 |
| 15 | (c) 50 mm2 to 95 mm2 |
| 16 | (d) 120 mm2 to 240 mm2 |
| 17 | (e) 300 m2 to 400 m2 |
| 18 | Lug crimping HT ( 11 kv) ( a) 150 mm2 to 250 mm2 |
| 19 | (b) 250 mm2 to 300 mm2 |
| 20 | Dismantling of LT cables from underground cable trench.a)- 1.5 mm2 to 6 mm2 |
| 21 | (b) 10 mm2 to 35 mm2 |
| 22 | (c ) 50 mm2 to 95 mm2 |
| 23 | (d ) 120 mm2 to 240 mm2 |
| 24 | (e) 300 mm2 to 400 mm2 |
| 25 | Dismantling of LT cables from cable tray above ground.a)- 1.5 mm2 to 6 mm2 |
| 26 | (b) 10 mm2 to 35 mm2 |
| 27 | (c ) 50 mm2 to 95 mm2 |
| 28 | (d ) 120 mm2 to 240 mm2 |
| 29 | (e) 300 mm2 to 400 mm2 |
| 30 | Erection and commissioning of new earthing pit with material G.I plate earthing. |
| 31 | Erection and commissioning of new earthing pit with materialCopper plate earthing. |
| 32 | H.T cable 3C x 240 mm2 and 3C x 300 mm2 HT kit filling with material (Raychem & 3M). |
| 33 | Testing and recharging of old earthing pit complete in all respect. |
| 34 | Fabrication of cable tray with old material. (i) Up to 50mm width |
| 35 | Fabrication of cable tray with old material. (ii) 50-100mm width |
| 36 | Fabrication of cable tray with old material. (iii) 200-250mm width |
| 37 | Erection of cable tray and installation. (i) upto 50mm width |
| 38 | Erection of cable tray and installation. (ii) 50-100mm width |
| 39 | Erection of cable tray and installation. (iii) 200-250mm width |
| 40 | LT panel shifting work |
| 41 | H. T panels shifting per cubic ft. |
| 42 | Dismantling of HT cables from underground cable trench. (i) 150-240 sqmm |
| 43 | Dismantling of HT cables from underground cable trench. (ii) 300 sqmm |
| 44 | Dismantling of HT cables from cable tray above ground. (i) 150-240 sqmm |
| 45 | Dismantling of HT cables from cable tray above ground. (ii) 300 sqmm |
| 46 | Installation & Dismantling of lightening arrestor 33KV |
| 47 | Installation & Dismantling of line isolator 33KV |
| 48 | Installation & Dismantling of bus bas of 33KV |
| 49 | Installation & dismantling of PT of 33KV each no |
| 50 | Installation & dismantling of PT of 33KV each no |
| 51 | Electrical wiring rates of single phase and three phase wiring: (Single Phase) each |
| 52 | Electrical wiring rates of single phase and three phase wiring: (Three Phase) each |
| 53 | Erection and commissioning of new cable trey (A) 50mm Each mm |
| 54 | Erection and commissioning of new cable trey (A) 70mm Each mm |
| 55 | Erection and commissioning of new cable trey (A) 150mm Each mm |
| 56 | Erection and commissioning of new cable trey (A) 300mm Each mm |
| 57 | Erection and commissioning of new cable trey (A) 600mm Each mm |
| 58 | Painting & repairing work lightning pole Each |
| 59 | Installation & dismantling of LT breakers rated 650A |
| 60 | Installation & dismantling of LT breakers rated 850A |
| 61 | Installation & dismantling of LT breakers rated 1200A |
| 62 | Installation & dismantling of LT breakers rated 1600A |
| 63 | Installation & dismantling of LT breakers rated 3200A |
| 64 | Installation & dismantling of LT breakers rated 4000A |
| 65 | Installation & dismantling of LT breakers rated 650A Please Enable Macros to View BoQ information |