Name of Work:- Repairs to 4 cusec discharge HC Pump unit no 01, 135 HP 3 Phase induction motor unit no 01 at LIS Seriplai.
Sl. No.
Item Description
1
Repairs to 4 cusec discharge HC pump unit no. 01 at LIS Seriplai. The job involves decoupling of pump from the motor and removing the top cover, extraction of shaft and impeller assembly together with bearing bracket by using suitable tools & tackles and skilled technicians. Carriage of the impeller shaft assembly by using manual labour, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to impeller shaft assembly at workshop by way of dismantling and extraction of damaged parts. Job includes repairs to pump shaft and impeller at damaged spots by way of re metaling then finishing to proper size so the shaft and impeller should be balanced. Providing and fitting of 2 nos. bearings at driving and non-driving end as per sample size. Providing and fitting of new bushes-2 Nos. and applying sufficient amount of grease to avoid excessive wear and tear. Fabrication of glands and studs with nuts. Repair to bearing brackets. Re-assembling of impeller shaft assembly and shifting back to site and there after lowering at proper position, placement of oil seal and closing the top cover along with P/F of new nuts, bolts and studs. Coupling the pump with the motor. P/F of gland packing. Priming the pump. Testing the pump on full load. The Job includes cost of material, labour (skilled and unskilled), loading charges, hire charge of tool and tackles, to and fro carriage charges. Complete Job. Repair to 135 HP 3 phase induction motor of pumping unit no. 1 installed at LIS Seriplai. The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. P/F of new bearings as per size and applying sufficient amount of grease to avoid excessive wear and tear. Assembling of the motor . Shifting the motor back to LIS . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete Job Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.