| 1 | Earth work in foundationexcavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 2 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 3 | Brick work in foundation and plinth using bricks of class in CM 1:6 |
| 4 | DPC with RCC IN 1:1.5:3 MIX |
| 5 | Brick work in super structue using bricks of class designation in CM 1:6 |
| 6 | Reinforced cement concrete work including curing compection ,finishing with rendering in cement sand morter 1:3 and making good and joints excluding cost of centering,shuttring and reinforcement in 1:1.5:3 |
| 7 | Providing and Fabricating reinforcement for RCC work including cutting,bending, placing in position and binding .. plinth beam & lintel beam |
| 8 | Centering and Shuttring with plywood or steel sheets including strutting , propping, bracing both ways with wooden members and removal of from work |
| 9 | STONE CHAJJA WITH dab stone |
| 10 | S & F steel girder including cutting, hoisting and fixing in positin up to 4.50m height |
| 11 | S & F stone sriwan in CM 1:6 |
| 12 | P & L First class stone slab roof in CM 1:4 |
| 13 | P & L Brick bat on stone roof in cm |
| 14 | S & F Mosaic tiles on roof in cm |
| 15 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 16 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete |
| 17 | Finishing walls with Acryic Smooth exterior paint of required shade including all scaffolding. NEW work (Two or more coat including base coat of water proofing cement paint ) 2022 pwd bsr |
| 18 | Wall painting with plastic emulsion paint of required shade including all scaffolding. New work (Two or more coat including base coat of water proofing cement paint ) 2022 pwd bsr |
| 19 | S & F iron door work |
| 20 | S & F iron window work |
| 21 | S & F Wire mesh on window |
| 22 | S & F grill on window |
| 23 | Enamel painting on door and window |
| 24 | Earth work in filling with Ordinary soil |
| 25 | Crrigiage of earth -lead ONE km |
| 26 | Cement concrete in floor withstone ballast size 40mm including curing and compaction etc in 1:6:12 mix |
| 27 | P & F Polished Kota Stone Flooring . |
| 28 | Wiring for fan/light point in PVC conduct pipe as per specifition |
| 29 | Wiring for circuit /submain as per specifition -2*1.5sqmm |
| 30 | S and F PVC PIPE 110MM |
| 31 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 32 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix |
| 33 | Brick work in foundation and plinth using bricks of class designation- in CM 1:6 |
| 34 | Brick work in super structure using bricks of class designation in CM 1:6 |
| 35 | S & F Stone lintels |
| 36 | P & L First class stone slab roof in CM 1:4 |
| 37 | P & L brick bats on roof |
| 38 | S & F Glaze tiles on roof and floor |
| 39 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 40 | 20mm thick plaster on new work including curing and racking of joints in CM 1:4 |
| 41 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete (PWD BSR-2022 - Less- 10%) |
| 42 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR -2022 Less-10%) |
| 43 | Wall painting with plastic emulsion paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR-2022 Les-10%) |
| 44 | S & F iron door |
| 45 | S & F iron window |
| 46 | Enamel painting on door and window |
| 47 | S & F Glaze tiles on walls |
| 48 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars,steps,Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. (PWD BSR-2022 Less-10%) Jhunjhunu / Jalore (Red /Choclate Up to 1501 Cm2 |
| 49 | Wiring for fan/light point in PVC condut pipe as per specification |
| 50 | Wiring for Power/light point in PVC condut pipe as per specification |
| 51 | Wiring for circuit/submain as per specification- 2x1.5Sqmm |
| 52 | S & F Water cooler |
| 53 | S & F Water filter |
| 54 | S & F Electric motor pump |
| 55 | S & F PVC water storage tank |
| 56 | S & F Bib cock |
| 57 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. (Internal work Exposed on wall) ( PWD BSR 2022. Less-10%) 20mm nominal size |
| 58 | S & F Full way valve-20mm |
| 59 | Yojna board & Contengency charges |
| 60 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 61 | Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc in 1:5:10 mix |
| 62 | Brick work in foundation and plinth using bricks of class designation-in |
| 63 | Brick work in super structure using bricks of class designation in CM |
| 64 | S & F Stone lintels |
| 65 | P & L First class stone slab roof in CM 1:4 |
| 66 | P & L brick bats on roof in CM 1:4 |
| 67 | 25mm thick plaster on roof |
| 68 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 |
| 69 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR -2022 Less-10%) |
| 70 | Wall painting with plastic emulsion paint of required shade including all scaffolding.New work ( Two or more coat incuding base coat of water proofing cement paint) -(PWD BSR- 2022 Les-10%) |
| 71 | S & F iron door |
| 72 | S & F C C jali |
| 73 | Enamel painting on door |
| 74 | Cement concrete in floor with stone ballast size 40mm including curing and compaction etc in 1:6:12 mix |
| 75 | S & F Glaze tiles on walls |
| 76 | S & F Vertified tile in floor |
| 77 | S & F Kota stone reck |
| 78 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with in a lead of 50m. |
| 79 | Brick work in foundation and plinth using bricks of class designation- in CM 1:6-112mm thick |
| 80 | Brick work in foundation and plinth using bricks of class designation- |
| 81 | 20mm thick plaster on new work including curing and racking of joints |
| 82 | P & L First class stone slab roof in |
| 83 | Wiring for fan/light point in PVC condut pipe as per specification |
| 84 | Wiring for light/Power point in PVC condut pipe as per specification |
| 85 | Wiring for circuit/submain as per specification- 2x1.5Sqmm |
| 86 | S & F PVC water storage tank |
| 87 | S & F Bib cock |
| 88 | S & F wash basin |
| 89 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. (Internal work Exposed on wall) ( PWD BSR - 2022. Less-10%) 20mm nominal size |
| 90 | S & F Full way valve-20mm |
| 91 | S & F Urinal |
| 92 | P & L PVC pipe-110mm |
| 93 | S & F Orisa WC pan |
| 94 | S & F Europian WC pan |
| 95 | S & F Cistern |
| 96 | S & F Half turn valve-25mm |
| 97 | Yojna board & Contingency charges |
| 98 | Furniture and others in samudayik kendr |
| 99 | Contingency charges 2% Please Enable Macros to View BoQ information |