| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size). |
| 3 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix |
| 4 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Walls (any thickness) including attached pilasters, buttresses plinth and string course. |
| 5 | Carriage of earth, sand, lime, morrum, manure or sludge including loading/ unloading etc. complete with lead upto 15km. |
| 6 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :: 20mm thick |
| 7 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. Thermo-mechanically Treated bars(Conforming of relevent IS code) 201x100 |
| 8 | Rough Chisel dressed Sand stone 35 mm thick flooring of approved shade set over 20mm thick base of cement mortar 1:6 (1 cement : 6 coarse sand) and pointing with cement sand mortar 1:3 with pigment to match the shade of stone with joint thickness up to 15 mm complete in all respects : Pink sand stone (Bansi Paharpur stone) |
| 9 | Supply and stacking of good earth at site complete including loading unloading & transportation etc. Good soil of earth |
| 10 | Spreading of manure and good earth in required thickness (cost of manure and good earth to be paid separately) |
| 11 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 4: 8 or leaner mix. |
| 12 | Making of railing as per following Specification design 2 Nos. vertical pole should be made in 1.0 mtr Distance & 1.0 Mtr. Height and also of 3” thickness. 2 Nos. cross pole should be made as per above specification. 1 Nos. horizontal pole should be made on top side as per above specification 3 Nos. 8mm size bars should be use every pole with 6 nos. rings of 4mm. G.I. wire.The stainless steel murga jhali should be fixed with every pole forC.C. work.All poles should be complete by 1:1:2 R.C.C. mixtureThe Plaster work should e complete by 1:2 mortar of not less than 12 mm thick.Finishing work should be complete by white cement oxide colours as per direction & made the pillar in Bally or Bamboo design or as per directionAfter finishing work should be done two coats of touch wood. Complete work should be done as per direction and entiresatisfication of engineer incharge. as per enclosed photo |
| 13 | Art painting work on walls with three coat of water proof putty of approved brand after duly rubbing the surface to make the surface even and smooth. The work includes one coat of exterior primer coat of approved brand and three or more coat of exterior plastic emulasation paint of approved brand over the prepared surface. over this Rajasthani art painting work to be done as per direction & design pattern approved by engineer inchareg. The work includes the cost of all centering & shuttering scaffolding and cleaning the site properly after completion of work. The work also includes the cost of all material, man power, stencils etc. required for Art painting. complete work should be done as per direction and entire satisfication of engineer incharge. |
| 14 | P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2.) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant. 75mm dia Please Enable Macros to View BoQ information |