| 1 | Establishment Cost E/W in excavation in foundation and filling on required places including proper levelling, dressing, manul compaction and T&P etc. |
| 2 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. |
| 3 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. |
| 4 | Supplying and laying of Steel reinforcement including cutting ,bendin,binding&placing in position at site. including cost of all materials, labours, T&P etc. |
| 5 | Centering and shuttering for P.C.C.in foundation and porcupine including cost of all materials , Labours T& P |
| 6 | Making / construction of coffer bund and earthen approach road by cartage earth of 2.00 mtr dia including cost of all materials , Labours , T&P etc. |
| 7 | Hiring of diesel pump 5 H.P including running by operator with fuel and all acessories like suction pipe and delivery pipe.for surface water lifting. |
| 8 | Supplying and Laying graded filter with Dala stone grit 12.50 mm - 20 mm.including cost of all materials, labours, T&P etc. |
| 9 | Supplying and Laying graded filter with coarse sand FM not less than 2 .including cost of all materials, labours, T&P etc. |
| 10 | Construction of 5 Nos store E/W in excavation in foundation and filling on required places including proper levelling, dressing, mannul compaction and T&P etc. |
| 11 | Supplying & Laying P.C.C. 1:4:8 with 20 mm to 40 mm size Dalla grit and morang sand not less than 2.0 F.M. including cost of all material labour and T&P etc. |
| 12 | Supplying and Laying of R.C.C (1:1.5:3) with stone grit and coarse sand including cost of all materials, labour, T&P etc. |
| 13 | Supplying and Laying of P.C.C (1:2:4) with stone grit and coarse sand including cost of all materials, labour, T&P etc. |
| 14 | Supplying and Laying of Brick ballast 40 mm gauge including cost of all materials, labour, T&P etc. |
| 15 | Supplying and Laying of local sand including cost of all materials, labour, T&P etc. |
| 16 | Supplying and Laying of flat brick soling for apron including cost of all materials, labour, T&P etc. |
| 17 | Supplying and Laying of flush pointing (1:3) over brick soling for apron including cost of all materials, labour, T&P etc. |
| 18 | Supplying and Laying of mortar (1:4) over roof slab including cost of all materials, labour, T&P etc. |
| 19 | First class brick work in 1:4 cement and chopan sand mortar including cost of all material labour,scafolding and T&P etc. required for proper completion of work. |
| 20 | Cement plaster in 1:4 on Brick masonary with sand mortar including cost of all material ,labour ,scafolding and T&P etc. required for proper completion of work. |
| 21 | Distempering two coat of oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of aprrved brand and manufacturer such as berger ,J&N,shalimar ,asian paints after thoroughly brushing the surface free from mortor dropping and other foreign matters and also including prepairing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials . |
| 22 | Providing and Fixing pressed steel door & window frames confirming to IS 4351 . Manufactured from commercial mild steel sheet of 1.20mm thickness including hings jamb,lock jamb beadand if required angle threshold of mildsteel angle of section 50x25 mm or base tie of 1.0 mm pressed mild steel welded or rigidly fixed together by mechanical means adjustable lugs with split end tail to each jamb including steel but hinges 2.5mm thick with mortor guards ,lock strike plate and soft absorvers as specified as and applying a coat of approved steel primer after pre treatment of the surface as directed by engineer in charge. |
| 23 | Supplying and Fixing of flush Door 40 mm thick ,commercial quallity confirming to I.S.2202 Part I(1983) including Fixing of wooden cleats and stoppers and including fixing and adjustment of hings .bolts locks,handles springs fitting with necessary screws to be supplied departmentally. |
| 24 | Painting two coat over priming coat ( but excluding cost of priming coat) on steel/new wood surface and other metal surface including cleaning the surface of all dirt ,dust and other foreign matter sand papering and stoping including cost of material ,labour ,T&P,etc.as requiered for completion of work paint shall be used as per standard IS specification. |
| 25 | Providing and fixing1.0mm M.S.thick sheet sliding shutter with frame & diagonal braces of 40x40x6.0mm angle Iron 3.0 mm M.S. gusset plateat the Junction and corner 25mm dia pully 40x40x6 mm angle T Iron guide at the top and bottom respectivltly including applying a priming coat of approved steel primer |
| 26 | supplying & fixing galvanized mosquito havy quality iron wire gauge of expanded metal havy quality our windows and including C.P. teak wood battens 3.0x10.0 cmoper completion with servers and including supply of all in material ,labour and T&P etc.requird for comlpetion of work |
| 27 | P/F Indian type white glazed earthen wire 1\\" Quality ISI marked WC pan size 580 x440 mm indian make of approved quality including cost of all material |
| 28 | Supply of PVC Bend of 100 mm dia including cost of all materials, labours, T&P etc |
| 29 | Supply of PVC pipe of 100 mm dia including cost of all materials, labours, T&P etc |
| 30 | Cutting ,Bending Binding ,and Placing in position of steel reinforcement including cost of all materials ,Labour T&P etc. requiored for proper completion of work |
| 31 | Centering and shuttering for P.C.C./R.C.C.in founation and porcupine including cost of shuttering R.C.C above G.L |
| 32 | Centering and shuttering for P.C.C./R.C.C.in founation and porcupine including cost of shuttering on ground. |
| 33 | 50 mm to 75 mm boring of hand pump including lowering of assembly and extraction of casing pipe including all cost of materials,labours, T&P etc. |
| 34 | E/W in filling by power transport within 1 Km. including excavation, loading, unloading, stacking and manualy compaction and dressing including all lift complete in all respect. |
| 35 | Provision for Solar Pannel of 1KW (As Per UPNEDA) @ Rs 53820/-KW} Please Enable Macros to View BoQ information |